Laserfiche WebLink
Notes from March 21, 2007 Platte River Recovery Implementation Program meeting <br />Nebraska (State/Water User address depletions) <br />State to offset effects of gw wells to target flows (1997 thru 2005) <br />Water user responsible for post-2005 effects <br />For wells>50 gpm, NRD's require offsets within the 28%-40 year line <br />For new surface water diversions/reservoirs, DNR will require offsets <br />State to offset new uses that do not require permits from NRD or DNR <br />WvominLy (Inclusive for existinQ denletions, selective for new depletions <br />Non-hydrologically connected areas are excluded <br />State to account for existing and new uses by sub-basin and "baselines" <br />2 independent baselines for existing activities <br />#1 irrigation above Guernsey Res (consistent with NP Decree) <br />#2 irrigation below Guernsey, municipal, industrial, other <br />Similar examination for new uses <br />Coordinate with WY State Engineer's Office <br />Colorado (Inclusive for existin,e and new depletions) <br />South Platte basin <br />Population driven <br />Calculate net effect at Julesburg due to a mix of 6 methods of water supply <br />development in 3 geographical areas. <br />Tamarack re-reg project to replace periods of depletion from periods of accretion <br />Membership in SPWRAP required to participate in CO's Depletion Plan <br />North Platte basin <br />Uses baselines per NP Decree <br />Stable or declining use anticipated; develop offsets in future if needed <br />Coordinate with SPWRAP <br />Federal (Selective for new Minor Uses) <br />Polled fed agencies ca 2001/2004 on anticipated federal uses ("National" scope) <br />If applicable, track and account for consumptive use changes for offsets <br />For small federal depletions, work with State Depletion Plans to extent possible <br />Total amount available per Fed Depletion Plan, if needed, = 350 ac-fdstate <br />Not intended for large, new federal depletions, or conservation activities <br />implemented on private lands <br />Scope of June 16, 2006 Programmatic Biological Opinion (PBO) & <br />Tiering <br />Scope included Program activities and tlie continued operation of existing and certain <br />new water related activities (i.e., those addressed within a Depletion Plan). <br />Future Sec. 7 consultations may "tier" from the PBO for existing activities and for new <br />activities covered by a Depletion Plan. <br />Species/habitat include: whooping crane, whooping crane critical habitat, interior least <br />tern, piping plover, pallid sturgeon (the "target species"). <br />2