Laserfiche WebLink
<br />Reservoir Operating Studies <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br /> <br /> <br /> <br />II I <br /> <br /> <br /> <br /> <br />Table 2-2 <br />Summary of Modeled Water Rights Listed by Priority <br />Maybell Canal <br />Senior Municipal <br />Hayden Station <br />Hayden Station <br />Senior Agriculture <br />Juniper Project4 <br />Four Counties <br />Craig Station <br />Stagecoach Res. <br />California Park <br />Steamboat Lake <br />Elkhead Res. <br />Mt. Werner Worn) <br />Stagecoach Res. <br />Lake Catamount <br />Elkhead Res. <br />Craig Station <br />Junior Agriculture <br />Mt. Werner (snow) <br />Steamboat Lake <br />Steamboat Springs Wells' <br />Future Mining <br />Future Coal Gas <br />Future Agriculture <br />Amount Admin No. <br />42.2 cfs 26810.18172 <br />varies' n.a. <br />27.0 cfs2 35987.27982 <br />3.0 cfs2 36295.17380 <br />varies3 n. a. <br />n.a. 38714.00000 <br />varies 39599.00000 <br />45.7 cfs 40815.00000 <br />11,614 of 40815.00000 <br />36,536.1 of 41126.00000 <br />23,064 of 41727.40833 <br />5,389 of 42642.00000 <br />2.7 cfs 42962.00000 <br />22,105 of 44559.44488 <br />7,800 af5 44761.00000 <br />8,310 of 44925.44731 <br />44.9 cfs 45290.44865 <br />varies n.a. <br />7.4 cfs 47859.00000 <br />3,300 of 51134.43234 <br />Notes: <br />1) Includes all gage adjustments to reach 1989 potential levels over entire study period l31us <br />future municipal demands at Craig and Hayden. <br />2) Hayden Station decrees combined into a single 30 cfs water right in model. Current <br />potential demand modeled as gage adjustment. <br />3) Includes gage adjustments to achieve 1989 potential demands and dry-year increments. <br />4) Not operated in all scenarios and operated in a subordinated priority position in some <br />scenarios. <br />5) Only 1,300 of/yr evaporation depletion actually modeled. <br />6) Includes all existing irrigation depletions estimated by Division 6 to be relying on water <br />rights adjudicated junior to 1954 Juniper project rights. <br />7) Future Steamboat Springs municipal demand, augmented from Stagecoach. <br />Reservoir Operations <br />Three existing reservoirs are operated explicitly in the basin model--Stagecoach <br />Reservoir, Steamboat Lake, and Elkhead Reservoir. The operations of all other existing <br />reservoirs (most of which are located in headwaters areas) were assumed to have negligible <br />effect on basin hydrology either because of their small size or because of their mode of <br />operation. <br />2-6