Laserfiche WebLink
<br />• Institutional considerations including support or opposition by various stakeholders, <br />conflicts with existing stakeholders/institutions, etc. <br />• Required Federal, state and local permits for implementation of the alternative. <br />Descriptions and analysis of the following alternatives are presented. <br />1. Expanded Coordinated Reservoir Operations <br />a. Green Mountain Reservoir Operations <br />b. Ruedi Reservoir Operations <br />c. Ruedi Reservoir Pumpback <br />d. CBT West Slope Facilities Operations <br />e. Denver Water Systems Operations <br />f. Bypass Diversions to Storage <br />g. Reduce Constraints on Existing CROP <br />2. Grand Valley-Centric Alternatives <br />a. Gunnison River Diversion into OMID Canals <br />b. Replace OMID Hydraulic Pumps With Electric Pumps <br />c. Pumping into GVIC System from Colorado River Below 15-Mile Reach <br />3. Efficiencies of Conveyance and Distribution Facilities <br />a. NCWCD <br />b. SECWCD <br />c. Municipalities <br />d. Reanalysis of Grand Valley Water Management Project <br />e. Analysis of GVIC Water Management <br />4. New Storage Projects <br />a. Above Shoshone: Reconfigured Eagle-Piney Project <br />b. Above Shoshone: Ranch Creek Reservoir <br />c. Above Shoshone: Wolcott Reservoir <br />d. Above Shoshone: Eagle Colorado Project <br />e. Above Shoshone: Jasper Reservoir <br />f. Below Shoshone: Roan Creek Reservoir <br />g. Below Shoshone: Mt. Logan Reservoir <br />h. Below Shoshone: Owens Creek Reservoir <br />p:\data\gen\0cwcb\18133\report\phase-1\chap-3.doc 3-2 <br /> <br /> <br />r <br />I <br />1 <br /> <br /> <br /> <br /> <br />1 <br />r. <br /> <br /> <br /> <br /> <br /> <br /> <br />