Laserfiche WebLink
1 <br />' periods 1990-2001 and 2000-2002, <br />respectively.20 ALP Phase II is assumed to be foregone in its <br />' entirety. <br /> <br /> <br /> <br /> <br /> <br />1 <br />Table 5-D-1 Agricultural Monetarv Impacts for the Can _Inan River Voffinn- WIP Q ...,.- (Immelk <br />Year Water Delivery Project Foregone Water Dollar Value of <br />Reduction' <br />1995-2000 No Impacts No Impacts No Impacts <br />2001-2040 NIIP Block 10 31,797 AF/yr (Agricultural) $9,781,954 <br /> (entire project) <br />2002-2040 NIIP Block 11 21,630 AF/yr (Agricultural) $6,654,672 <br /> (entire project) <br />2005-2040 ALP Phase I, Stage B 42,960 AF/yr (Agricultural) $6,359,320 <br /> (Project scaled to 21 % of <br /> original size) <br />2010-2040 ALP Phase II 42,988 AF/yr (Agricultural) $5,595,387 <br /> (entire project) <br />2011-2040 No further impacts N/A N/A <br />1 11C uuuar value or eacn roregone agricultural project was assumed to be identical for each year from the initial <br />year until the end of the study period. <br />1 Table 5-D-2 Construction Sector Monetary Impacts for the San Juan River Region: WF Scenario (1990$) <br /> <br /> <br /> <br /> <br />Figures from U.S. Department of Interior, 1995 <br />' 20 Costs for blocks 10 and 11 were estimated from information contained in NAPI. 1990. Projected remaining <br />NIIP construction costs of $313 million were divided equally across Blocks 7-11 to derive the estimated construction <br />costs. <br /> <br />39 <br />Year Associated Project Construction Cost <br />1998-2005 ALP Phase I, Stage B $18,909,131/yr <br /> (Project scaled to 21 % of original size) <br />1999-2001 NIIP Block 10 $20,907,000/yr <br /> (entire project) <br />2000-2002 NIIP Block 11 $20,907,000/yr <br /> (entire project) <br />2005-2010 ALP Phase II $26,117,000/yr <br /> (entire project) <br />11