Laserfiche WebLink
,~ '"`~S'~~",.. ~_r• '~°°'~?'•~'s r ~ti, 3~'s"`,;~'',.2y ~. • ~ -~'^`~'~-< er- r:~+Zs : ~a~r5. ~'~4~+ ,~`.~i ~ <br />.. .CYyt_ 4..i wry.. 4 _~. .. .. ... ~ - ~ - .. .. .- -. .. <br />The- contract has been awarded for a bridge spanning the <br />Colorado River 1,000 feet downstream from the dam site. This <br />.>; '~ bridge,- 1,271 feet long, will be a steel-arch structure, 40 feet wide ~" <br />~? r , and 700, feet above the river,. making it -the highest bridge of its. <br />type in the world. Its single arch will be 1,028 feet in length, second <br />`~"~ only to the Bayonne Bridge between- Staten Island, 1VTew York axid <br />}:~ ,; " New Jersey: More. than, 3500 tons of~ structural steel, 250 tons of <br />reinforcing steel,- and 2,650 cubic yawls- of-concrete will be utilized <br />in its construction. - <br />diversion tunnel through the right abutment of the dam site <br />is under construction. The contract for this tunnel was awarded it <br />October, 1956. <br />~' Specifications for the dam and power plant will be eompieted <br />-early in-1957. The prime contract for the construction of these two <br />features is expected to be awarded in the spring of 1957. <br />~2. Flaming Gorge Unit ~ s ,"`< <br />The Flaming Gorge Dam- and Reservoir will be located on the <br />_- 'Green River in northeastern Utah, 40 miles north of Vernal, Utah, <br />and ~2 miles downstream from the Utah-`Wyoming state- line. The <br />- dam will be a concrete thin-arch structure rising 440 feet above <br />the ricer. The reservoir will have a capacity of 3,920,000 acre-feet <br />_ ,` and will extend upstream 94 miles, nearly to the- town of Green <br />..River, «'yoming. The power plant will have an installed generating <br />capacity of 8,000 kilowatts. <br />Construet.ion Aetivities <br />Construction activities: at Flaming Gorge are being conducted <br />from temp©rax;y headquarters at .Vernal, Utah. Diamond drilling-, <br />T'~ to determine foundation conditions for final design; i, well ad- <br />~:~ wanced. Contracts have been awarded for the construction of 0.3 <br />of a-mile of new roadway-, rehabilitation of :even miles of e.Yistin~• :\ <br />road, and the construction of a timber bridge; 345 feet in length, <br />_, ,across the Green River. The Bureau of Reclamation plans to let <br />- a contract for the remaining ten miles of the road early in the <br />- _ spring of -1957. after the completion of this stretch, the dam site <br />will be connected. by an oiled highway with a railhead at Green <br />1• River, ~Wioming. ~ Government to~t-n tiviil be located on Dutch <br />John Flat about three miles north. of the dam.:~pproach roads from <br />: Vernal, L'tah, are being improved by the State of Utah-and the U. S. <br />v ..-~- _ _ .. _. ..-. -- <br />~;, ~. , <br />'.~.*+.:~Se a ...~...» = - "-- ii7eSS '~,.F?,w~irro.~s~3w+: <<`+.,,r.~..a.iTa.~~ne+Cav~.-=3f .. ~+ .- -i...:~:.,~w.r, <br />-i 3 - <br />