My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
4208
CWCB
>
UCREFRP
>
Public
>
4208
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:28 PM
Creation date
5/22/2009 7:10:23 PM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
4208
Author
U.S. Bureau of Reclamation.
Title
Development in the Upper Colorado Basin, The Bureau of Reclamation Defends Itself.
USFW Year
n.d.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_ - - " - - . ~~tw.a +~.~ s ~ <br />Forest Service: About.. 11~ay,* 1957 the Bureau expects to Iet a. ' <br />contract for a diversion. tunnel.;. Following completion of a definite <br />5 :: <br />plan report,: the prime contract-,.for the dam and power plant. will ~•-` ~' <br />be awarded in the- fall of 1957. - ~s~; <br />k <br />3. Navajo Unit- - - ~ ~" -:-w - ~_~ <br />~4, i. <br />.. _ . _. '_ <br />The Navajo Dam wi'Il-b~ located ur: northwestern New l~Zexico- ~ '_ <br />on the- San Juan River, 34 miles east. of Farmington, and.31~~~, miles _ <br />do ~cnstream from the confluence of Los Pinos -and San Juan Rivers.- <br />The dam will be of rolled. earth-fill embankment. type.. The original .: <br />plan. included .a reservoir- with a capacity of Y,450,000 acre-feet. fix' _ <br />:1~Iore recent studies, however,"indicate a reservoir size of 1,700,000 <br />acre-feet with an active capacity of 960,000 acre-feet. ,After a joint:., <br />;study of the optimum capacity of the reservoir by the State of New ..a <br />~Sexico and the Bureau of Reclamation, the- Interstate Stream .`~ '" <br />Commission of the State recommended that a 1,700,000 acre-foot <br />reservoir be constructed. Sediment accumulation in the reservoir ~ti <br />will- be heavy and -will amount to 330,000- acre-feet over a 100-year ` " <br />period, much of the sediment being. deposited in the inactive <br />section of the reservoir;. This reservoir will be used to regulate the. , <br />~ilows of the San Juan River for the potential Navajo Irrigation <br />Project near Farmington, the San Juan-Chama Project on the "'=. <br />',eastern side of the mountains, and perhaps for the small authorized•ri <br />Hammond Project.. A part. of the water made available to the _ <br />.Navajo Irrigation Project also may be used for ,industrial and , <br />municipal purposes. A small amount of flood protection to down- - <br />~tream developments and some recreational facilities will also be _ <br />provided, <br />Construction Activities ~^"~ <br />Eight hundred thousand dollars werev earmarked in the ~ppro- _ <br />- "priations- Act for 1957-for the start of construction on Navajo Dam:. "~ ' <br />Engineering and geologic investigations are being undertaken as <br />_. ,.a basis for final designs and specifications. Temporary headquarters ~ ~ y <br />have been. established at Farmington,. New ;4iexico= to,: complete ~ - <br />preconstruetion -investigations and to administer a= construction <br />contract for an access road. - <br />_ ~~ <br />_;. .. <br />4~ Curecanti LTnit -~ <br />The Curecanti Storage 1• nit will be located on the Gunnison _ <br />° Ricer in western Colorado,.- upstream from the Black.. Canpon ~ E <br />.~ ._ ._ - <br />~*f~'~rv 4 .Q ~+ <br />~'~ ~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.