Laserfiche WebLink
CONTENTS - Continued <br />Table Page <br />29A The concentration of phytoplankton and zooplankton (>505-µm size-fraction) at Headgate <br /> for phases 1 and 2 (Jan. 1987 to June 1987) .......................................... 63 <br />30A The concentration of phytoplankton and zooplankton (>505-µm size-fraction) at Pal Verde <br /> Diversion Dam for phases 1 and 2 (Jan. 1987 to June 1987) ............................ 64 <br />31A The concentration of phytoplankton and zooplankton (>505-µm size-fraction) at Cibola <br /> for phases 1 and 2 (Jan. 1987 to June 1987) .......................................... 65 <br />32A The concentration of phytoplankton and zooplankton (>505-µm size-fraction) at Imperial <br /> Dam for phases 1 and 2 (Jan. 1987 to June 1987) ..................................... 66 <br />33A The concentration of phytoplankton and zooplankton (>505-µm size-fraction) at Yuma <br /> for phases 1 and 2 (Jan. 1987 to June 1987) .......................................... 67 <br />34A Concentration of zooplankton at Davis Dam for phases 1 and 2 (Oct. 1986 to Aug. 1988) ..... 68 <br />35A Concentration of zooplankton at Park Moabi for phases 1 and 2 (.Oct. 1986 to Aug. 1988) .... 68 <br />36A Concentration of zooplankton at Parker Dam for phases 1 and 2 (Oct. 1986 to Aug. 1988) .... 69 <br />37A Concentration of zooplankton at Headgate Rock Dam for phase 1 (Oct. 1986 to Aug. 1988) ... 69 <br />38A Concentration of zooplankton at Palo Verde Diversion Dam for phases 1 and 2 (Oct. 1986 <br /> to Aug. 1988) ....................................................................... 70 <br />39A Concentration of zooplankton at Cibola for phases 1 and 2 (Oct. 1986 to Aug. 1988) ......... 70 <br />40A Concentration of zooplankton at Imperial Dam for phases 1 and 2 (Oct. 1986 to Aug. 1988)... 71 <br />41 A Concentration of zooplankton at Yuma for phases 1 and 2 (Oct. 1986 to Aug. 1988) ......... 71 <br />42A Concentration of POM for >505-µm size-fraction (g/m3) for all stations duirng phase 1 ...... 72 <br />43A Dry weight for >505-µm size-fraction (g/m3) for all stations during phase 1 ................. 72 <br />44A The >25-µm size-fraction of dry weight (g/m3) for all stations during phases 1 and 2 ........ 73 <br />45A The >25-µm size-fraction of POM (g/m3) for all stations during phases 1 and 2 .............. 74 <br />46A The <25-µm size-fraction of dry weight (g/m3) for all stations during phases 1 and 2 ........ 75 <br />47A The <25-µm size-fraction of POM (g/m3) for all stations during phases 1 and 2 ............. 76 <br />48A Total POM (g/m3) for all stations during phases 1 and 2 ................................... 77 <br />49A Toatl dry weight (g/m3) for all stations during phases 1 and 2 .............................. 78 <br />50A Total dry weight (g/m3), total ash weight (g/m3), and total POM (g/m3) for all stations <br /> during phases 1 and 2 ................................................................ 79 <br /> FIGURES <br />Figure <br />1 Lower Colorado River divided into 10 operational divisions; all stations are included for <br /> phases 1 and 2 ....................................................................... 2 <br />2 Mean weekly river flows at Davis Dam, Parker Dam, Palo Verde Diversion Dam, Imperial <br /> Dam, and Yuma for phases 1 and 2 (Oct. 1986 to Aug. 1988) ............................ 5 <br />3 Total chlorophyll a concentrations at Davis Dam, Palo Verde Diversion Dam, <br /> Imperial Dam, and Yuma during phase 1 (Oct. 1986 to June 1987) ........................ 8 <br />4 The <25-µm, 25- to 505-µm, and >505-µm size-fractions of POM during phase 1 at all <br /> sampling stations (Oct. 1986 to June 1987) ............................................ 12 <br />5 Composition of dry weight during phase 1 at all sampling stations .......................... 16 <br />6 Composition of dry weight during phase 2 at all sampling stations .......................... 16 <br />7 Percent POM in total particulate matter during phase 2 at all sampling stations .............. 17 <br />8 Concentration of POM during phase 2 at all sampling stations .............................. 17 <br />9 Concentration of total inorganic matter below reservoirs during phase 2 (Jan. to Aug. 1988) 17 <br />10 Concentration of total POM below reservoirs during phase 2 (Jan. to Aug. 1988) ............ 17 <br />11 Concentration of total inorganic matter above and below backwater complexes during <br /> phase 2(Jan.to Aug. 1988) .......................................................... 19 <br />12 Concentration of total POM above and below backwater complexes during phase•2 (Jan. <br /> <br />13 to Aug. 1988) ....................................................................... <br />Concentration of chlorophyll a above and below backwater complexes during phase 2 19 <br /> (Jan. to Aug. 1988) .................................................................. 19 <br />14 Number of zooplankton taxa collected in each major group during phase 2 (Jan. through <br /> <br />15 Aug. 1988) ......................................................................... <br />Concentration of POM at Cibola, in Palo Verde Irrigation Drain, and at DR3 during phase 2 20 <br /> (Jan. through Aug. 1988) ............................................................. 21