My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8132
CWCB
>
UCREFRP
>
Public
>
8132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:33 PM
Creation date
5/20/2009 10:50:49 AM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
8132
Author
Lieberman, D. and T. Burke.
Title
Limnology and Drift of Particulate Organic Matter Through the Lower Colorado River.
USFW Year
1991.
USFW - Doc Type
Denver, CO.
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
88
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CONTENTS - Continued <br />Table Page <br />10 F-test results based on ANOVA between all stations and >505-µm dry weight (DW), and <br /> >505-µm POM for phase 1 (Oct. 1986 through June 1987) ............................... 13 <br />11 Percentage of POM to dry weight, POM/DW, for each size-fraction and total sample <br /> for phase 1 (Oct. 1986 to June 1987) .................................................. 13 <br />12 Range, mean x, and standard deviation s for total dry weight (DW), total ash weight (AW), <br /> and total POM for phase 1 (Oct. 1986 through June 1987) .............................. 14 <br />13 F-test results based on ANOVA between all sampling stations and total dry weight (DW), <br /> and total POM for phase 1 (Oct. 1986 through June 1987) ............................... 15 <br />14 Comparison of total mean annual POM between the lower Colorado River and 6 and 7 <br /> order Western United States streams .................................................. 15 <br />15 Mean values for various parameters above, in, and below Palo Verde Irrigation Drain <br /> during phase 2 (Jan. through Aug. 1988) .............................................. 20 <br />16 Mean total inorganic nitrogen TIN, TP, P04-P, and ratios TIN/TP, and TIN/PO4-P for the <br /> entire study period .................................................................. 21 <br />17 Mean values for various parameters measured in the lower Colorado River both above <br /> and below Imperial Dam (Laguna), and within the All-American Canal ................... 22 <br />1A Field survey dates at each station on the lower Colorado River for phases 1 and 2 ........... 35 <br />2A Physical, chemical, and biological parameters measured at each station for phases 1 and 2 ... 36 <br />3A River flows in ft3/s (m3/s) for all stations during phases 1 and 2 ........................... 37 <br />4A Water temperature (°C) for all stations during phases 1 and 2 .............................. 38 <br />5A Dissolved oxygen (mg/L) for all stations during phases 1 and 2 ............................ 39 <br />6A Specific conductance ()uS/cm) for all stations during phases 1 and 2 ....................... 40 <br />7A pH for all stations during phases 1 and 2 ................................................. 41 <br />8A Oxidation-reduction potential (mV) for all stations during phases 1 and 2 ................... 42 <br />9A Turbidity (NTU) for all stations during phases 1 and 2 ...................................... 43 <br />10A P04-P (mg/L) for all stations during phases 1 and 2 .......... .......................... 44 <br />11A TP (mg/L) for all stations during phases 1 and 2 .......................................... 45 <br />12A N03-N (mg/L) for all stations during phases 1 and 2 ...................................... 46 <br />13A N02-N (mg/L) for all stations during phases 1 and 2 ...................................... 47 <br />14A NH3-N (mg/L) for all stations for phases 1 and 2 .......................................... 48 <br />15A TKN (mg/L) for all stations for phases 1 and 2 ............................................ 49 <br />16A Total chlorophyll a concentration (mg/m3) for all stations during phases 1 and 2 ............ 50 <br />17A Phytoplankton species (<25-µm and >25-µm size-fraction) at each sampling station from <br /> the lower Colorado River based on August 1988 collection .............................. 51 <br />18A The concentration of phytoplankton (>25-µm size-fraction) at Davis Dam for phases 1 <br /> and 2 (Oct. 1986 to Aug. 1988) ....................................................... 55 <br />19A The concentration of phytoplankton (>25-µm size-fraction) at Park Moabi for phases 1 <br /> and 2 (Oct. 1986 to Aug. 1988) ....................................................... 56 <br />20A The concentration of phytoplankton (>25-µm size-fraction) at Parker Dam for phases 1 <br /> and 2 (Oct. 1986 to Aug. 1988) ....................................................... 56 <br />21 A The concentration of phytoplankton (>25-µm size-fraction) at Headgate Rock Dam for <br /> phase 1 (Oct. 1986 to June 1987) .................................................... 57 <br />22A The concentration of phytoplankton (>25-µm size-fraction) at Palo Verde Diversion Dam for <br /> phases 1 and 2 (Oct. 1986 to Aug. 1988) .............................................. 57 <br />23A The concentration of phytoplankton (>25-µm size-fraction) at Cibola for phases 1 and 2 <br /> (Oct. 1986 to Aug. 1988) ............................................................. 58 <br />24A The concentration of phytoplankton (>25-jum size-fraction) at Imperial Dam for phases 1 <br /> and 2 (Oct. 1986 to Aug. 1988) ....................................................... 58 <br />25A The concentration of phytoplankton (>25-µm size-fraction) at Yuma for phases 1 and 2 <br /> (Oct. 1986 to Aug. 1988) ............................................................. 59 <br />26A The concentration of phytoplankton and zooplankton (>505-µm size-fraction) at Davie Dam <br /> for phase 1 (Jan. 1987 to June 1987) ................................................. 60 <br />27A The concentration of phytoplankton and zooplankton (>505-µm size-fraction) at Park Moabi <br /> for phase 1 (Jan. 1987 to June 1987) ................................................. 61 <br />28A The concentration of phytoplankton and zooplankton (>505-µm size-fraction) at Parker Dam <br /> for phase 1 (Jan. 1987 to June 1987) ................................................. 62 <br />iv
The URL can be used to link to this page
Your browser does not support the video tag.