My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
9419 (2)
CWCB
>
UCREFRP
>
Public
>
9419 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/14/2009 5:02:35 PM
Creation date
5/20/2009 9:33:32 AM
Metadata
Fields
Template:
UCREFRP
UCREFRP Catalog Number
9419
Author
Jones Construction.
Title
Completion Report ofr Redlands Passageway.
USFW Year
1995.
USFW - Doc Type
\
Copyright Material
NO
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
76
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
1 <br />May 21, 1996, storage shed and covered work area are completed. <br />Fencing <br />1 <br />April 22, 1996, contractor's subcontractor (Taylor Fencing) begins installation of fencing. <br />May 21, 1996, all fencing is completed. <br />1 Electrical <br />1 <br /> <br /> <br />1 <br /> <br /> <br />1 <br />February 29, 1996, Contractor's electrical subcontractor (Eberhart Electric) installed stub out for <br />power feed to jib crane pad. <br />March 1, 1996, electrical subcontractor installed PVC conduit from meter well to level sensor <br />location. <br />March 12, 1996, electrical subcontractor installed PVC conduit for storage shed and covered <br />work area. Conduit was laid below the bottom of the slab and backfilled to the slab subgrade <br />with structural backfill. <br />April 23, 1996, electrical subcontractor installed 1 1/4-inch conduit and pulled the wire from the <br />light pole to the meter pole. The meter and disconnect pole are installed at the south side of the <br />covered work area. Also installed a load center box in the storage shed and a NEMA enclosure <br />installed on the exterior of the flow meter vertical pipe. <br />April 24, 1996, Public Service Company installed overhead line from the transformer to the light <br />pole and brought the power down to the underground line installed on the 23rd. The electrical <br />subcontractor worked on the meter and disconnect box at the covered work area, the load center <br />hookup in the storage shed, and the switch and electrical box for the jib crane. The motor and <br />trolley were also installed on the crane arm. <br />April 25, 1996, electrical subcontractor pulled wire through conduit from flow meter vault to the <br />load center in the storage shed. Also wired in the jib crane motor. <br />April 29, 1996, electrical subcontractor pulled wires through conduit from storage shed to <br />switches and outlets at covered work area. Wiring for sump pump was completed. <br />May 15, 1996, electrical subcontractor installing'/2-inch RGC conduit from meter well to <br />entrance structure. Conduit is anchored to the left side of the passageway wall approximately 2 <br />to 3 inches below the top of the footer wall. <br />May 16, 1996, electrical subcontractor completed installing 1/2-inch RGC conduit from meter <br />well to the entrance structure. Installed the light fixture in the storage shed, the photo cell <br />Const-14