Laserfiche WebLink
1 <br /> <br /> <br />1 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />1 <br />March 18, 1996, 42-inch sluice gate delivered to jobsite. <br />March 28, 1996, contractor installing gates. <br />April 10, 1996, contractor completed grouting of gates. Gate installation is complete. <br />Grouted Rip Rap <br />March 20, 1996, contractor began placing rip rap (modification) at entrance structure. <br />April 1, 1996, contractor completes placing rip rap and grouting of rip rap is done. <br />Reference Photos: CN-1745-417-113NA <br />Cleaning of rip rap at entrance structure (Modification work) prior to placement of grout. <br />Note: aluminum sluice gates in position. <br />Metalwork <br />March 20, 1996, trash racks, bar racks, horizontal channels for baffles at entrance structure, and <br />various "T' beams for grating supports were delivered onsite. <br />March 28, 1996, contractor installing bar and trash racks. <br />April 23, 1996, contractor begins to set aluminum baffles. All baffles are in place on April 25, <br />1996. <br />April 26, 1996, "V" trap delivered and installed. <br />' Reference Photos: CN-174541746NA, CN-1745417-50NA, CN-1745417-57NA, <br />CN-1745-417-61NA, CN-1745417-64NA, CN-1745-417-66NA, CN-1745-417- 72NA and <br />CN-1745-417- 107NA <br />Storage Shed and Covered Work Area <br />' April 15, 1996, carpenter crew installs bottom plate for storage shed. <br />' April 16, 1996, carpenter crew installs 2"X4" walls, 2"X6" trusses, and 1/2 inch CDX plywood at <br />storage shed. <br />April 26, 1996, carpenter crew begins work on covered work area. <br />1 Const-13