Laserfiche WebLink
fixture on the storage shed at the exterior near the roof line. Also installed the 1/2-inch RGC <br />conduit from below grade to the stilling well recorder and pulled the wire into the flow meter <br />' transmitter. <br />May 17, 1996, electrical subcontractor cadwelded ground rods to ground cable at the meter well <br />' and storage shed. Pulled wire from the storage shed to the level indicator and through the flow <br />meter to the entrance structure. Installed a GFI duplex outlet on the exterior of the storage shed. <br />' May 23, 1996, electrical subcontractor installed rigid metal conduit and pulled the wires from <br />the floor of the storage shed to the 4'X4'X 1/2" CDX plywood the data logger is mounted to. <br />' May 24, 1996, electrical subcontractor installed the digital readout at the entrance structure. <br />' June 5, 1996, electrical subcontractor installed the diffuser on the light fixture in the storage <br />shed. All electrical work is complete. <br />Const-15