Laserfiche WebLink
Table 4: STREAM GAUGING SITES <br /> Name ElevationlLocation <br />a North Fork Ditch 6,400 feet; near its confluence with the South Arkansas <br />b Poncha Creek 7,520 feet; near its confluence with the South Arkansas <br /> 8,200 feet; above the confluence of North Fork <br />c Cottonwood Creek Cottonwood Creek on the main stem of Cottonwood <br /> Creek <br /> ~ g20 feek an irrigation ditch near the confluence of <br />d Trout Creek Co. Ditch Cottonwood Creek with the Arkansas River <br /> 820 feet; in the Trout Creek watershed southeast of <br />7 <br />e UAWCD/Moltz Well , <br />Buena Vista <br /> 200 feet; in Fremont County near the confluence of <br />6 <br />f Texas Creek , <br />Texas Creek with the Arkansas River <br /> Lesteratterbury 5,100 feet; an irrigation ditch near the Arkansas east of <br />g Au mentation Station Carson Ci <br /> South Arkansas 8,600 feet; upstream of the confluence of the North <br />h Public Service Co. Fork with the South Arkansas <br />I South Arkansas 7,200 feet; south of Salida above the confluence with <br /> Tenassee diversion the Arkansas <br />Task Binvolves on-the-ground construction of custom-fitted weirs /flumes at nine strategically located <br />streams. Table 5 summarizes the Task B scope of work, which includes Tasks B1 through B4; for cost <br />details see the Section 3. <br />Task B involves constructing measuring devices and telemetry gauging at nine streams strategically <br />chosen to generate the accurate water flow measurements needed for good water management. It includes <br />Tasks 61 through B4. This will involve on-the-ground construction of custom-fitted weirs /flumes. Currently, <br />there are only two U.S.G.S. gauging devices in the District. <br />TABLE 5: TASK B SCOPE OF WORK SUMMARY <br />Task Description <br /> Phase I Design Flow Control Device <br /> o Design <br /> o Equipment costing (weirs/flumes) <br />B1 o Site survey and design drawings <br /> o Construction performance work plan <br /> o Permitting and environmental compliance <br /> o Pro'ect mana ement 8 meetin s <br /> Phase II Measuring Device Construction <br /> o Ordering cepital equipment <br />62 o Subcontracflng <br /> o Mobilization <br /> o Construction oversi ht <br /> Phase III Gauging Instrumentation Equipment <br /> o Vetting/costing 2 platform designs (done) <br />B3 o Ordering capital equipment <br /> o Hook gauge sensors to telemetry data collection platform <br /> o Test run datalogger and sensors <br /> o Calibratin and re ortin initial month data <br />B4 Financial Re ortin , Performance R Orlin ,Final Re rt <br />Procedure: A team approach will be used. The team will work together under contract to The Upper <br />Arkansas Water Conservancy District through its Water Activity Enterprise Fund. The project team was <br />4 <br />