My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150073 Final Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150073 Final Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 3:33:07 PM
Creation date
4/23/2009 10:05:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150073
Contractor Name
Southeastern Colorado Water Conservancy District - Water Activity Enterprise
Contract Type
Grant
Water District
14
County
Pueblo
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Evaluation of the Arkansas Valley Pipeline <br />Water Works! Committee <br />June 2003 <br /> 3.4.5 Disposal Alternatives for Reverse Osmosis Reject 37 <br />3.5 Pipeline Design Evaluations 46 <br /> 3.5.1 General 46 <br /> 3.5.2 Pipeline Alignment Evaluations 46 <br />3.6 Project Cost Estimates 54 <br />3.7 Implementation Schedule 59 <br />3.8 Evaluation of Alternatives 60 <br />Section 4 -Economic and Financial Evaluations 61 <br />4.1 Economic Evaluation 61 <br />4.2 Potential Funding Sources 61 <br /> 4.2.1 Local Government Borrowing Capacity 62 <br /> 4.2.2 State of Colorado Funding Sources 63 <br /> 4.2.3 Federal Funding Sources 64 <br />4.3 Preliminary Observations 65 <br />Section 5 -Institutional Evaluations 66 <br />5.1 Potential Institutional Frameworks 66 <br />5.2 Potential Selection Criteria for an Institutional Framework 66 <br />5.3 Identification and Description of Alternative Institutional Frameworks 67 <br /> 5.3.1 Special Districts 67 <br /> 5.3.2 Water Conservancy Districts 69 <br /> 5.3.3 Subdistricts of WCDs 71 <br /> 5.3.4 Mutual Water Company 72 <br /> 5.3.5 Water Authority 74 <br />5.4 Evaluation of Institutional Frameworks 75 <br /> 5.4.1 Evaluation of Special Districts 75 <br /> 5.4.2 Evaluation of WCDs 76 <br /> 5.4.3 Evaluation of WCD Subdistricts 76 <br /> 5.4.4 Evaluation of Mutual Water Companies 76 <br /> 5.4.5 Evaluation of Water Authorities 76 <br />5.5 Stakeholder Preferences 77 <br />Section 6 - Meetincts 78 <br />6.1 Progress Meetings 78 <br />6.2 Public Information Meetings 79 <br />Section 7 -Conclusions $~ <br />7.1 Phase 1 81 <br />7.2 Phase 2 82 <br />Section 8- Recommendations 84 <br />Section 9 -References 85 <br />_.~ ~~ <br />GEI Consultants, InC. 0128403-06-30 Feasibility Evaluation Final <br />
The URL can be used to link to this page
Your browser does not support the video tag.