Laserfiche WebLink
Table of Contents <br />Executive Summary v <br />Section 1 -Introduction ~ <br />1.1 Purpose and Need 1 <br />1.2 Background 2 <br />1.3 Service Areas and Project Participants 3 <br />1.4 Authorization 3 <br />1.5 Acknowledgements 3 <br />Section 2 -Scope of Work 5 <br />2.1 General 5 <br />2.2 Phase 1 5 <br />2.3 Phase 2 5 <br />2.4 Work Products 6 <br />Section 3 - Engineering Evaluations 7 <br />3.1 Water Demand Analysis 7 <br /> 3.1.1 Data Collection and Review 7 <br /> 3.1.2 Population Forecasts 7 <br /> 3.1.3 Water Demand Estimates 9 <br /> 3.1.4 Water Demand Summary 14 <br />3.2 Water Rights 15 <br /> 3.2.1 General 15 <br /> 3.2.2 Fryingpan-Arkansas Project Water 17 <br /> 3.2.4 Potential for Exchanging Measured Municipal Return Flows to <br /> Pueblo Reservoir 18 <br /> 3.2.3 Potential for Exchanging Existing Water Rights Upstream to Puebl o <br /> Reservoir 21 <br /> 3.2.5 Evaluation of Effects on Arkansas River Water from Water Rights <br /> Substitutions and Exchanges 22 <br />3.3 Water Demand Management 27 <br /> 3.3.1 Potential for Municipal Water Conservation Measures 27 <br /> 3.3.2 Evaluation of Blending Arkansas Valley Pipeline Deliveries with <br /> Local Water Supplies 28 <br /> 3.3.3 Potential for Treated Wastewater Reuse to Satisfy Non-Potable <br /> Water Demands 30 <br />3.4 Water Treatment 31 <br /> 3.4.1 Background 31 <br /> 3.4.2 Option 1 -Upstream Central Water Treatment Plant Option 32 <br /> 3.4.3 Options 2 and 3 -Local and Regional Water Treatment Plants 33 <br /> 3.4.4 Option 4 -Water Treatment for the "No-Action" Option 34 <br />