My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150073 Final Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150073 Final Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 3:33:07 PM
Creation date
4/23/2009 10:05:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150073
Contractor Name
Southeastern Colorado Water Conservancy District - Water Activity Enterprise
Contract Type
Grant
Water District
14
County
Pueblo
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Table of Contents <br />Executive Summary v <br />Section 1 -Introduction ~ <br />1.1 Purpose and Need 1 <br />1.2 Background 2 <br />1.3 Service Areas and Project Participants 3 <br />1.4 Authorization 3 <br />1.5 Acknowledgements 3 <br />Section 2 -Scope of Work 5 <br />2.1 General 5 <br />2.2 Phase 1 5 <br />2.3 Phase 2 5 <br />2.4 Work Products 6 <br />Section 3 - Engineering Evaluations 7 <br />3.1 Water Demand Analysis 7 <br /> 3.1.1 Data Collection and Review 7 <br /> 3.1.2 Population Forecasts 7 <br /> 3.1.3 Water Demand Estimates 9 <br /> 3.1.4 Water Demand Summary 14 <br />3.2 Water Rights 15 <br /> 3.2.1 General 15 <br /> 3.2.2 Fryingpan-Arkansas Project Water 17 <br /> 3.2.4 Potential for Exchanging Measured Municipal Return Flows to <br /> Pueblo Reservoir 18 <br /> 3.2.3 Potential for Exchanging Existing Water Rights Upstream to Puebl o <br /> Reservoir 21 <br /> 3.2.5 Evaluation of Effects on Arkansas River Water from Water Rights <br /> Substitutions and Exchanges 22 <br />3.3 Water Demand Management 27 <br /> 3.3.1 Potential for Municipal Water Conservation Measures 27 <br /> 3.3.2 Evaluation of Blending Arkansas Valley Pipeline Deliveries with <br /> Local Water Supplies 28 <br /> 3.3.3 Potential for Treated Wastewater Reuse to Satisfy Non-Potable <br /> Water Demands 30 <br />3.4 Water Treatment 31 <br /> 3.4.1 Background 31 <br /> 3.4.2 Option 1 -Upstream Central Water Treatment Plant Option 32 <br /> 3.4.3 Options 2 and 3 -Local and Regional Water Treatment Plants 33 <br /> 3.4.4 Option 4 -Water Treatment for the "No-Action" Option 34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.