My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150073 Final Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
1001-2000
>
C150073 Final Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/13/2010 3:33:07 PM
Creation date
4/23/2009 10:05:54 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150073
Contractor Name
Southeastern Colorado Water Conservancy District - Water Activity Enterprise
Contract Type
Grant
Water District
14
County
Pueblo
Bill Number
SB 01-157
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
183
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Feasibility Evaluation of the Arkansas Valley Pipeline <br />Water Works! Committee <br />June 2003 <br />List of Tables <br />Table 3.1 Selected Data From Survey <br />Table 3.2 Population Forecasts <br />Table 3.3 Summary of Water Demand Estimates <br />Table 3.4 Summary of Water Rights and Ditch/Canal Company Shares <br />Table 3.5 Allocations of Fryingpan-Arkansas Project Water (1972 - 2001) <br />Table 3.6 Average Concentrations from USGS Water Quality Data, 1990-2000 <br />Table 3.7 Opinions of Probable Cost for Capital and Operations and Maintenance Costs for <br />Water Treatment Alternatives <br />Table 3.8 Preliminary Arkansas Valley Pipeline Sizing <br />Table 3.9 Arkansas Valley Pipeline -Preliminary Construction Cost Estimate Adapted <br />Alignment <br />Table 3.10 Opinion Of Probable Cost For The "No Action" Alternative <br />Table 4.1 Measures of Local Government Borrowing Capacity in the Study Area <br />Table 4.2 Colorado Federal Funding Sources <br />Table 4.3 Federal Funding Sources <br />List of Figures <br />Figure 3.1 Central Treatment Plant to Meet All Demand <br />Figure 3.2 Supplemental Treated Water <br />Figure 3.3 Supplemental Raw Water <br />Figure 3.4 No Action Alternative <br />Figure 3.5 Alignments Through City of Pueblo <br />Figure 3.6 Bessemer Ditch Typical Sections <br />Figure 3.7 Southern Highway 50 Alignment -Suitability Base <br />Figure 3.8 Southern Highway 50 Alignment -Topo Base <br />Figure 3.9 Southern Spur Alignment -Suitability Base <br />Figure 3.10 Southern Spur Alignment -Topo Base <br />Figure 3.11 Northern Spur Alignment -Suitability Base <br />Figure 3.12 Northern Spur Alignment -Topo Base <br />Figure 3.13 Adapted Alignment -Suitability Base <br />Figure 3.14 Adapted Alignment -Topo Base <br />Figure 3.15 Bessemer Ditch and Adapted Alignment -Head Graph <br />Figure 3.16 Bessemer Ditch and Adapted Alignment -Profile <br />GEI Consultants, Inc. 01284 03-06-30 Feasibility Evaluation Final <br />
The URL can be used to link to this page
Your browser does not support the video tag.