Laserfiche WebLink
I <br />1 <br />District Court, Water Division 6, Colorado <br />Case ]~lo. 02CW 106; Application of Colorado River Water Conservgtion District and its Colorac~ River Wafer <br />Frojects Enterprise, in Routt and Moffat Counties, Colorado <br />Decree of fate Water Coart <br />Page 2 of 7 <br />The Court hereby finds, concludes and decrees: <br />1. The statements i~, the Appiic~tion arg true. <br />2. Applicant: The name, address srtd telephone number of the Applicant is: <br />Colorado River Water Conservation District and its <br />Colorado River Water Projects Enterprise (hereinafter, the "River District") <br />Attn: Secretary/General Manager <br />20l Centennial Street, Suite 200 <br />F.G. Box 1120 <br />Glenwood Springs, Colorado 81 b02 <br />Telephone: (970) 945-8522 <br />Facsimile: (970) 945-8799 <br />3. N fire and 3urisdiction: Proper notice of the Application was given in the manner provided <br />bylaw, and the time for (fling Statements of Opposition to this Application has expired. The <br />Court has jurisdiction over the subject matter of the Application and over all parties who <br />have standing to appear whether or not they have appeared. <br />4. o i#i n: <br />A. On February 26, 2043, Tri-State Generation and Transmission Association, Inc. <br />{hereinafter, "Tri-State") filed a timely Statement of ©pposition. <br />$. The River D;strict and Tri-State entered into a Stipulation and Agreement on May 4, <br />2005, by which Tri-State consents to the entry of this decree. The Stipulation and <br />Agreement is incorporated herein by this-reference. <br />5. Report-and Summary of Consultation l~ thg,~ivision Engiaeer: The Water Court finds that <br />the River District has addressed the issues raised in the Division Engineer's Report and <br />Summary of Consultation dated May 7, 2003. <br />6. Description of Water Ri,~ts: <br />A. introduction: Eikhead Creek Reservoir is an existing reservoir with a current storage <br />