My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Montezuma (2)
CWCB
>
Grants
>
DayForward
>
Montezuma (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 12:17:55 PM
Creation date
1/6/2009 11:43:40 AM
Metadata
Fields
Template:
Grants
Applicant
Anderson Consulting Engineers, Inc.
Grant Type
FEMA
Fiscal Year (i.e. 2008)
2005
Project Name
Montezuma County DFIRM Project
CWCB Section
Watershed & Flood Protection
Contract/PO #
C154035
Grants - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
70
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• • DFIRM mapping files, prepared in acc~rdancs with the requirements in Guidelines and <br />Spec~catiorrs for Flood Hazard Mapping Pariners; <br />• Metadata files describing the DFIRM data, including all required information shown in <br />C'ruidelines and Specifications for Flood Hazar~d Mapping Parmers; <br />• Complete set of plots of DFIRM panels showing all detailed flood hazard information at a <br />suitable scale; and <br />• Dcoumentation that describes and provides the results of all automated or manual QA/QC review <br />steps taken during the preparation of tr~e DFII~M. <br />Appendix M may be downloaded from the FErvIA Flood Hazard Mapping Web site at <br />?~1t~://~W~~v.fema.~ov/~df/f~~m/~~,. s~ am.~?d~ <br />Activity 14A - DFIRM ~roduction (~Appti~ation of FEMA Graphics and D~tabase <br />Sp~ecific~tions) <br />Responsible Mapping Parhier: CWCB <br />Scope: CWCB shall apply the fmal FEMA D:FIRM graphics and database specifications to the DFIRM <br />files produced under Activity 14. This work sliall inc~ude adding all required annotation, line pattern, <br />area shading, and map collar information (e.g., map borders, title blocks, legends, notes to users}. CWCB <br />shall coordinate with FEMA a~d those Mappir~g Partners responsible for Activities 10, 10A, l OB, 13, and <br />14, as necessary, to resolve any problems that ;3re idemtified during Activity 14A. <br />~ Standards: All work under Activity 14A shall be perf~rmed in accordance with the standards specified in <br />Section 5 of this MAS. <br />Deliverables: In accordance with the TSDN format ~escribed in described in Append'uc M of Guidedines <br />and Spec~cations for Flood Hazard Mapping Parine~rs, CWCB shall make the following products <br />available to FEMA: <br />• Digital work maps showing the 1- and 0.2-percent-annual-chance floodplain boundary <br />delineations, regulatory floodway bowndary d~elineations, cross sections, BFEs, flood insurance <br />risk zone labels, and all applicable base map teatures; <br />• DFIRM mapping files, prepared in acc;ordanc~e with the requirements in Guidelines and <br />Spec~cations for Flood Hazard Map~~ing P~tners; <br />• Metadata files describing the DFIRM ~data, in~luding all required information shown in <br />Guidelines and Specifications for Floc~d Hazcrrd Mapping Partners; <br />• Complete set of plots mf DFIRM panells showing a11 detailed flood hazard information at a <br />suitable scale; and <br />• A Summary Report that describes and provid~s the results of all automated or manual QA/QC <br />review steps taken during the preparation of t-ie DFIRM; and <br />• NSP Format DFIRM Database or Inte~rmediate Data Delivery consistent with the NSF Data <br />Capture Standards. <br />• Appendix N may be doumloaded from the FErvIA Flood Hazard Mapping Web site at <br />h~tp://wwvv.ferna. og~v/~df/fhm/frrr~ ~sana.pc ; <br />Mapping Activity Statement No. 11: Montezunna Coui~ty} <br />Colorado Water Conservation Board <br />
The URL can be used to link to this page
Your browser does not support the video tag.