Laserfiche WebLink
• <br />Activity 14 - DFIRM Production (Me~rging Revised and Non-Revised Infou~mation) <br />Responsible Mappin~~Partner: CWCB <br />Sco e: Upon completion of the floodplain mapping aativities for the revised areas which include those <br />areas included in the Dolores Valley Restudy a~d the ~City of Cortez's restudy efforts, CWCB shall merge <br />the digital floodplain data into the single, updated DFIRM. This work includes the tie-in of flood hazard <br />information for areas that were not studied as ~rart of t--e Flood Map Project documented in this MAS. <br />CWCB also shall tie in the revised and non-revised Fl~ood Profiles, floodplain boundaries, and regulatory <br />floodway boundaries with con~iguous commun~ities that were not studied as part of the Flood Map Project <br />documented in this MAS. CWCB shall coordinate with FEMA and those Mapping Parhiers responsible <br />for Activities 10, 10A, IOB, and 13, as necessa~ry, to rusolve any potential tie-in issues. <br />The ar~eas to be incorporated into the DFIRM~include,~ <br /># Dolores River (~SAC~ study) from the western end of the Town of Dolores to the confluence with <br />Priest C'rulch, approzimately 28 miles, <br />~k West Dolores River (USACE study) fr~~m the c:onfluence with Dolores River to the northern <br />county boundary, approximately 3 miles, <br />~k Priest Gulch (IISACE study) from the confluence with Dolores River to the northern counry <br />~ boundary, approximaPely 3 miles, <br /># Cornett Heights Tributary to Hartmcm~ Draw (Cortez study) from the corporate limits to the end, <br />approximately 0.5 mile, <br />~k South-Central Tributcary to McElmo (t~ortez s~tudy) from the corporate limits to the errd, <br />approximately 1 mide, <br /># Carpenter Wash Tributary to Hartma~7 Draw AKA McElmo Creek Tributary 12.2 (Cortez study) <br />from the corporate li~reits to the enal, qpproxir~nately 2 miles, <br />~k Glade Draw Tributary AKA McElmo ~Creek Tributary 11 (Cortez study), from the corporate <br />limits to the end, approximatelyl.5 miles, an~t, <br />~k Denny Lake AKA Mc~lmo Creek Tributary 7(Cortez study) within the carporate limits, <br />approximately O.S mile. <br />Standards: All work under Activity 14 shall be perfo~rmed in accordance with the standards specified in <br />Section 5 of this MAS. <br />Deliverables: In accordance with the TSDN iformat described in described in Appendiac M o~Cruidelines <br />and Spec~cations for Flood I~azard Mappin8~ PartnErs, CWCB shall make the following products <br />available to FEMA: <br />• Digital work maps showing the 1- and 0.2-percent-annual-chance floodplain boundary <br />delinearions, regulatory floodway boumdary clelineations, cross sections, BFEs, flood insurance <br />• risk zone labels, and all applicable ba>e map features; <br />Mapping Activity Statement No. 11: Montezuma County} <br />Colorado Water Conservation Board <br />