Laserfiche WebLink
• The time and cost estimates shall be prepared in accordance with the template for preparing time and eost <br />es~imate;s is provided in Appendix I, Subsection I.3.2 of the Guidelines and Specifications for Flood <br />Fdazard Mapping Partners. <br />Staiadards: All work under Activity 2 shall be pe;rformed in accordance with the standards specified in <br />Section ,5 of this MAS. <br />Delnvera~bles: Documentation of time and cost Estimate for the project. Any backup oa~ supplemental <br />imforma~tion will also be included upon reques~. <br />Appendix I may be downioaded from the FEN1~~ Flood Hazard Mapping Weh site at <br />h'~~t~//v~r~rv/.:ema.~o~/~Sdf/~hm/frm i sa~ a.p~f. <br />T'ask 2-21 Updates to M~pping Needs Updat~e Support System (1VINUSS) Database or its successor <br />Responyible Partner: CWCB <br />Scape: Once the SOW or MAS is fmalized, CWCB shall update the MNUSS database to indicate that the <br />needs imcluded in the SOW or MAS are bein~ addressed in an ongoing Flood Map Project. They shall <br />also update the MNUSS database to add any new needs or revise e~cisting needs identified during the <br />scoping; activities that will not be addressed by the current project. Additionally, they shall flag the needs <br />$hat could nat be verified during the reseazch and community coordination acrivities as"not verified." <br />Standat•ds: All work undeP Activity 2 shall be performed in accordance with tlne standards specified in <br />Section 5 of this MAS. <br />• Deliverables: Email from the MNUSS administrator stating that the MNUSS update was successful. <br />Appendi~c I anay be downfloaded from the FEMA Flood Hazard Mapping Web site at <br />~?~i~://~~w.f~m~.~~ov/pdf/ff-~~t/f-rrt s, a,~ i.~df <br />'II'ask 2-22 Outreach, Coordination & Consu~~ltation <br />Responsible Partner: CWCB <br />Scope: By proactively reaching out to all key stakeholders as early in the Flood Map Project as possible, <br />the maps can be used to tll~eir full potential. The likelihood of appeals may also be reduced or eliminated. <br />CWCB has developed an outreach plan (located in the State Business Plan) to accomplish the following: <br />establishing two-way con~munication to addre,ss the needs of, inform and obtain feedback from, the <br />st.~kehalders; ensuring campliance with due process requirements; interacting wit1~ technical <br />representatives to ensure pmduction of accurane and icp-to-date maps; enhancing ovvnershap by <br />comm~unities; tracking, monitoring, and evalu~iting outreach activities and adjusting efforts according to <br />~~agoi~g feedback and evolving project needs. <br />CWC~3 shall also assist FEMA's Consultarion Coorda`nation Ufficer (CCO) ir~ consultatioa~ and <br />coordination efforts to ac~dress outreach activities to educate stakeholders ab~ut this ~lood Map Project. <br />CVVCl3 shall also assist FEMA in the coordination and outreach with local officials by helping them <br />contac;t the locai officials and the Staie NFIP Coordinator and inform them that their commurnity has been <br />selecte~d for a possible stn~dy. They shall also work with FEMA and local officials to inform the <br />~ cmmmunity and request information through r~eetings and other consultation activities. <br />Mapping Activity Statement No. 10: Montezuima County} 14 <br />Color~do Water Conservation Board <br />