Laserfiche WebLink
• Standards: All work under Activity 2 shall be performed in accordance with the standards specified in <br />Section 5 of this MAS. <br />Deliverables: A report documenting the assi~~-ments of the Project Team members in accordance with <br />the deli.very dates specified in task orders. <br />Appendix I may be downloaded from the FEMA Flood Hazard 11tlapping Web site at <br />- ~://~ - ~' -- <br />- .-v~~:_,__P.~ ,r~.~/;a~~/~~~---,~~`__,-_ ~;s~i:~c~`. <br />Task 2-11 Scoping Meeting Documentation <br />Responsible Parir~er: CWCB <br />Scope: The CWCB and the FBS&J Team shall prepare and distribute the meeting minutes, which shall <br />include a list of all the participants and their r~,spective assignments for the project, as well as the overall <br />schedule for the project as discussed at the Scoping Meeting. Tlhe overall project schedule shall establish <br />the basis for each Project Team member's assignment(s). Project Team members shall review their task <br />assigrua~ents and provide feedback or commer.its. All changes to the proposed scope, schedule, and task <br />assignments shall be coordinated with CWCB .and the other team members <br />Standards: All work under Activity 2 shall be performed in accordance with the standards specified in <br />Sectiorn 5 of this MAS. <br />Deliverabtes: A report documenting the Sc~oping Meeting including attendees sign-in list, scoping <br />• meeting minutes, project schedule summarizing prioritized needs within the community. Needs are <br />prioritized so that areas of geatest need can be addressed with the available funding. Backup or <br />supplemental information used in wrnting this report <br />Appendix I may be downloaded from the FEMA Flood Hazard Mapping Web site at <br />_J.ll.~_'.~l. ~~ -~'i'_~_lr __-I~_~~ ~SG.1.= <br />Task 2-12 Statement of Worlc or Mapping A,ctivity State~ent Revision <br />Responsible Partner: CWCB <br />Scope: The PBS&J Team shall work closely ~with the CWCB to develop or revise the Mapping Activity <br />Statement (MAS) based on task assignment~~ made during the Scoping Meeting and any subsequent <br />changes. FEMA Itegional Project Officer, FEIVIA Regional Contcacting Officer, and FEMA HQ Program <br />M~r-ager shall review and approve the SO~v or MAS before it is distributed to the Project Team <br />members. The MAS shall follow the template provided in Appendix I, Subsection I.3.1 of these <br />Guidelines and Specifications for Flood Hazard Mapping Partners. <br />Standa~•ds: All work under Activity 2 shall be performed in accordance with the standards specified in <br />Section 5 of this MAS. <br />Deliverables: The deliverable shall be the revi;>ed Mapping Activity Statement <br />. <br />Mapping Activity Statement No. 7 <br />Colorado Water Consenration Board 9 <br />