My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Larimer County (2)
CWCB
>
Grants
>
DayForward
>
Larimer County (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 12:17:55 PM
Creation date
1/6/2009 11:25:47 AM
Metadata
Fields
Template:
Grants
Grant Type
FEMA
Fiscal Year (i.e. 2008)
2007
Project Name
Larimer County DFIRM Project
CWCB Section
Watershed & Flood Protection
Contract/PO #
C154013, 154032
Grants - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• Standards: All work under Activity 2 shall be performed in accordance with the standards specified in <br />Section 5 of this MAS. <br />Deliverables: A report documenting the assi~~-ments of the Project Team members in accordance with <br />the deli.very dates specified in task orders. <br />Appendix I may be downloaded from the FEMA Flood Hazard 11tlapping Web site at <br />- ~://~ - ~' -- <br />- .-v~~:_,__P.~ ,r~.~/;a~~/~~~---,~~`__,-_ ~;s~i:~c~`. <br />Task 2-11 Scoping Meeting Documentation <br />Responsible Parir~er: CWCB <br />Scope: The CWCB and the FBS&J Team shall prepare and distribute the meeting minutes, which shall <br />include a list of all the participants and their r~,spective assignments for the project, as well as the overall <br />schedule for the project as discussed at the Scoping Meeting. Tlhe overall project schedule shall establish <br />the basis for each Project Team member's assignment(s). Project Team members shall review their task <br />assigrua~ents and provide feedback or commer.its. All changes to the proposed scope, schedule, and task <br />assignments shall be coordinated with CWCB .and the other team members <br />Standards: All work under Activity 2 shall be performed in accordance with the standards specified in <br />Sectiorn 5 of this MAS. <br />Deliverabtes: A report documenting the Sc~oping Meeting including attendees sign-in list, scoping <br />• meeting minutes, project schedule summarizing prioritized needs within the community. Needs are <br />prioritized so that areas of geatest need can be addressed with the available funding. Backup or <br />supplemental information used in wrnting this report <br />Appendix I may be downloaded from the FEMA Flood Hazard Mapping Web site at <br />_J.ll.~_'.~l. ~~ -~'i'_~_lr __-I~_~~ ~SG.1.= <br />Task 2-12 Statement of Worlc or Mapping A,ctivity State~ent Revision <br />Responsible Partner: CWCB <br />Scope: The PBS&J Team shall work closely ~with the CWCB to develop or revise the Mapping Activity <br />Statement (MAS) based on task assignment~~ made during the Scoping Meeting and any subsequent <br />changes. FEMA Itegional Project Officer, FEIVIA Regional Contcacting Officer, and FEMA HQ Program <br />M~r-ager shall review and approve the SO~v or MAS before it is distributed to the Project Team <br />members. The MAS shall follow the template provided in Appendix I, Subsection I.3.1 of these <br />Guidelines and Specifications for Flood Hazard Mapping Partners. <br />Standa~•ds: All work under Activity 2 shall be performed in accordance with the standards specified in <br />Section 5 of this MAS. <br />Deliverables: The deliverable shall be the revi;>ed Mapping Activity Statement <br />. <br />Mapping Activity Statement No. 7 <br />Colorado Water Consenration Board 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.