My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Larimer County (2)
CWCB
>
Grants
>
DayForward
>
Larimer County (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2010 12:17:55 PM
Creation date
1/6/2009 11:25:47 AM
Metadata
Fields
Template:
Grants
Grant Type
FEMA
Fiscal Year (i.e. 2008)
2007
Project Name
Larimer County DFIRM Project
CWCB Section
Watershed & Flood Protection
Contract/PO #
C154013, 154032
Grants - Doc Type
Scope of Work
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• ~~ppendix I Hnay be downloaded from the FEMA Flood Hazard Mapping Web site at <br />:~7:~~\ti'\'t'\'. EJ,1-i: ~Tir)~ -~1 I ` ~_~ _ f_~SL1. :C`- <br />7Cask 2-13 Time and Cost Estimate Prepar~tion <br />F:esponsible Partner: CWCB <br />~~cope: The PBS&J Team sha11 be responsible for preparing time and cost estimates for all assigned tasks <br />a.s well as coordinating and compiling time ac~d cost estimates from other mapping partners. Based on <br />tlhe SOW or M[AS, each mapping partner partiicipating in the flood map project shall develop a time and <br />cost estimate for assigned tasks. As part of these estimates, Project Team members also shall establish a <br />schedule for their portion of the work within the schedule from the Scoping Meeting. <br />7'he time and cost estimates shall be prepared iin accardance with the template for preparing time and cost <br />e~stimates is provided in Appendix I, Subsection I.3.2 of the Ga~idelines and Specifications for Flood <br />Hazard Ma~nping Fartners. <br />~~tandards: All work under Activity 2 shall b~~ performed in accordance with the standards specified in <br />~~ectiorn 5 of this MAS. <br />I)eliverables: A report containing time and ~~ost estimates for all tasks. Any backup or supplemental <br />i:nformation used in writing this report will also be included. <br />~ Appendix I may be downloaded from the FEMA Flood Hazard 1dlapping Web site at <br />://,~~~~,.~,..~~-r=~~~-v/;cr/`,-rir ~-_?c_. <br />7Cask 2-14 Finalization of Project Managem~~nt Plan <br />FCespomsible Partrner: CWCB <br />~~cope: The P~S&J Team, in consultation wilh the CWCB, FEMA Regional Project Officer and FEMA <br />FZegional Contract Officer, shall incorporate the final SOW or MAS into the Project Management Plan <br />a~nd establish intermediate project reporting a~1d project close-out requirements. The Plan shall then be <br />ready for finalizaxion <br />~~tandards: All work under Activity 2 shall be performed in accordance with the standards specified in <br />S~ection 5 of this MAS. <br />Deliverables: A Final Project 1Vlanagement Pl~ui report and the backup or supplemental information used <br />in writing this plan <br />Appendix I may be downloaded from the FEMA Flood Hazard Mapping Web site at <br />,_,_.://~,~<<;,- '=e-r=_.s=o~'/:;c /f-"/`~ _ ~:~G;._c., <br />7Cask 2-15 Updates to M~pping Needs Update Suppor~ System (MNUSS) Database or its <br />r~eplacement <br />~ <br />h~apping Activity Statement No. 7 <br />C:o9orado Water Conservation Board 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.