Laserfiche WebLink
~ Responsible Partner: FEMA (NSP) <br />Scope: Once the SOW or MAS are finalized, IFEMA (NSP) shall update the MNUSS database to indicate <br />that the needs included in the SOW or MAS are being addressed in an ongoing Flood Map Project. They <br />sh~ll also update the MNUSS database to add any new needs ar revise existing needs identified during the <br />scoping activities that will not be addressed by the current project. Additionally, they shall flag the needs <br />that could not be verified during the research and community coordinarion activities as"not verified." <br />Standards: All work under Activity 1 shall be ~-erformed in accordance with the standards specified in <br />Section 5 of this MAS. <br />Deliverables: Email from the 1VINUSS admini,~trator stating t.~-at the MNUSS update was successful <br />Appendix I may be downloaded from the FEMA Flood Hazard Mapping Web site at <br />-i~~://~~~,ti~~~-,•d.'c-~~. -cvi~-c.:/.':'."/' ~sG:.~c'.~ <br />----- `~--'----- - <br />Task 2-16 Ougreach, Coordination & ConsultaHon <br />Responsible Partner: CWCB <br />Scope: By proactively reaching out to all key stakeholders as early in the Flood Map Project as possible, <br />~ the ma}~s can be used to their full potential. Tlie likelihood of appeals may also be reduced or eliminated. <br />The CWCB and PBS&J Team shall develop a~i Outreach plan by determining the best way to accomplish <br />the following: establishing two-way communiication to address the needs of, inform and obtain feedback <br />~ from, the stalceholders; ensuring compliance with due process requirements; interacting with technical <br />representatives to ensure production of accurate and up-to-date maps; enhancing ownership by <br />communities; txacking, monitoring, and evalu;~ting outreach activities and adjusting efforts according to <br />ongoing feedback and evolving project needs. <br />The CWCB and PBS&J Team shall also ass~ist FEMA's Consultation Coordination Officer (CCO) in <br />consultation and coordination efforts to address outreach activities to educate stakeholders about this <br />Flood Map ]Project <br />The CWC~ and FBS&J Team shall also a~osist FEMA in tl~e coordination and outreach with local <br />officials by helping them contact the local o~cials and the State NFIP Coordinator and inform them that <br />their community has been selected for a pos~sible study. They shall also work with FEMA and local <br />officials to inform the community and request information tYu~ough meetings and other consultation <br />activities. <br />Standards: Atl work under Activity 2 shall be performed in accordance with the standards specified in <br />Section 5 of this MAS. <br />• <br />IVlapping Activity Statement No. 7 <br />Colorado Water Conservation ~oard 11 <br />