Laserfiche WebLink
~ <br />. <br />1. Prepare individual ownership project p~~~cel maps for all the project areas. GJDD will retain a <br />surveyor to prepare the legal descripticros and exhibits. <br />2. Mesa County and GJDD will perform all the ROW purchases. The Consultant will prepare the <br />support information for the easements and purchase agreements. <br />D. Produce Final Report and other Scope Deliverables (Cost $12,500) <br />Consultant shall produce a final documentation report to clearly and concisely convey the designs and <br />recommendations of the Scope tasks. Typical report outline as follows: <br />1. Color Cover (to be approved by the CWCB) <br />2. Table of Contents <br />3. Executive Summary <br />4. Main Report Text, Plans, and Graphics <br />a. Introduction/Study and Reviews <br />b. Objective of Study <br />c. Authorization <br />d. Acknowledgement of the Hydrology and Hydraulic Determinations <br />e. Performance of the Project Tasks <br />f. Independent report for the right-of-Hray maps and legal descriptions <br />g. Project contracting manual and biddling documents <br />h. Engineering support - flood photographs, charts, graphics, news articles, and tables to support <br />the text. <br />Technical Addendum <br />1. Telephone contact sheets <br />2. Meeting summaries <br />3. Trip reports/field visit summaries <br />4. Contact spreadsheet or database pr~intout <br />5. Survey notes <br />6. Color photographs <br />7. H & H computations <br />8. All other technical backup informatic~n for the study <br />MEETINGS AND COORDINATION <br />Formal progress meetings between CWCB, G~IDD, and Consultant will be required for this Scope of <br />Services. A maximum of finro (2) meetings will t~e required on site in Grand Junction. Any other necessary <br />meetings will be conducted at the CWCB o~ce~ in Denver or by conference call. The Consultant's Project <br />Manager shall provide verbal reports and writte~n status reports via e-mail to the CWCB Study Manager, <br />Mr. Kevin Houck, as requested. Any Scope-rel~~ted questions o~ problems should be directed to Mr. Kevin <br />Houck @ 303.866.4805 or Kevin.houck@state,co.us <br />COMPLE~ION OF WORK <br />Schedule <br />The Consultant shall complete all tasks as assigned in this Scope of Services relating to Bosley Wash <br />Flood Protection Project within 180 calendar d~iys from the Notice to Proceed. The draft reports shall <br />include as much information as possible with the realization that reliance on others to supply information <br />may delay the production of the final report. Once the preliminary investigations and reports have been <br />submitted, the CWCB and GJDD shall have 14 calendar days to review the draft report and provide written <br />comments to the Consultant. The Consultant sF~all address the comments from the CWCB and GJDD and <br />submit the final revised final report within 14 ca;lendar days of receipt of the CWCB and GJDD review <br />comments. <br />