My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
FLOOD11633
CWCB
>
Floodplain Documents
>
DayForward
>
1100
>
FLOOD11633
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 8:25:21 AM
Creation date
1/5/2009 4:09:33 PM
Metadata
Fields
Template:
Floodplain Documents
County
Mesa
Stream Name
Bosley Wash
Title
Bosley Wash Flood Protection Project
Date
6/8/2006
Contract/PO #
C154049
Floodplain - Doc Type
Contract
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• . <br />For the performance project tasks, a final sche~dule wili be determined and agreed upon at the time of <br />"notice to proceed" for the study contract. <br />Specific Deliverables <br />Consultant shall submit the following items: <br />1. 2 hard copies of draft report. <br />2. 10 hard copies of the final report with color drawings, figures, maps/plans, and photos. <br />3. 2 CD's containing PDF files of Final Re~port in its entirety, plus ~nal digital text and graphic files in <br />their original file formats. Repo~t shoul~d be submitted in MS Word format. <br />4. 2 hard copies of the bound Technical p,ddendum (8.5"x 11 ") format with index and cover approved <br />by CWCB. <br />The completion of individual design and right-c~f-way reports shall be completed within the contract time <br />period for the project design or as otherwise ai~thorized by CWCB staff. <br />END OF SCOPE OF SERVICES <br />
The URL can be used to link to this page
Your browser does not support the video tag.