Laserfiche WebLink
• . <br />For the performance project tasks, a final sche~dule wili be determined and agreed upon at the time of <br />"notice to proceed" for the study contract. <br />Specific Deliverables <br />Consultant shall submit the following items: <br />1. 2 hard copies of draft report. <br />2. 10 hard copies of the final report with color drawings, figures, maps/plans, and photos. <br />3. 2 CD's containing PDF files of Final Re~port in its entirety, plus ~nal digital text and graphic files in <br />their original file formats. Repo~t shoul~d be submitted in MS Word format. <br />4. 2 hard copies of the bound Technical p,ddendum (8.5"x 11 ") format with index and cover approved <br />by CWCB. <br />The completion of individual design and right-c~f-way reports shall be completed within the contract time <br />period for the project design or as otherwise ai~thorized by CWCB staff. <br />END OF SCOPE OF SERVICES <br />