My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150279 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150279 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2011 1:44:50 PM
Creation date
12/2/2008 10:07:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150279
Contractor Name
Boulder White Rock Ditch and Reservoir Company
Contract Type
Loan
Water District
0
County
Boulder
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONFQUR <br />Formulation of Alternatives <br />3. The pump station will contain four vertical line-shaft pumps that will extend into the wet <br />well below the pump room. Two pumps will be dedicated to the North Branch Ditch <br />pipeline using 60 horsepower motors, the other two pumps will be dedicated to the Upper <br />Lateral pipeline and have 75 horsepower motors. <br />4. Total pumping capacity using both pumps for the North Branch Ditch pipeline will be <br />6,800 gpm (3,400 gpm each pump) and for the Upper Lateral pipeline will be 5,400 gpm <br />(2,700 gpm each pump). <br />The North Branch Ditch pipeline will consist of a 24-inch diameter pipe and will be 3501inear <br />feet long. It will consist of steel pipe at the pump station and will convert to polyvinyl chloride <br />(PVC) within a few feet of the pump station to the discharge location. There will be only one <br />discharge structure located along the pipeline. <br />The second pipeline will have various pipe diameters along its alignment beginning as a 21-inch <br />diameter pipe at the pump station and then will reduce down to 18-inch and then to 12-inch <br />diameter. The pipeline will have several discharge locations and will extend over 3,4001inear <br />feet to the Upper Lateral discharge location. There will be four separate discharge points along <br />the pipeline. <br />General layout drawings are presented in Appendix C. <br />'~~ 4-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.