My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150279 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150279 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/9/2011 1:44:50 PM
Creation date
12/2/2008 10:07:11 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150279
Contractor Name
Boulder White Rock Ditch and Reservoir Company
Contract Type
Loan
Water District
0
County
Boulder
Weld
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
SECTIONFIVE Selection of Alternative and Financial Plan <br />5.1 NARRATIVE DESCRIPTION <br />Based on the financial, institutional, and social impacts, Alternative 2 -Maintenance was <br />selected as the preferred alternative for the project. The preferred alternative was selected based <br />on constructability, costs, reliability, reduced impact to the environment, and provision for the <br />continued use of the asset (historic water yield). <br />5.2 LAND AND RIGHT-OF-WAY REQUIREMENTS <br />The Company owns or has easements to construct the project in its entirety. The Company owns <br />the land where the pump station will be constructed. The Company has or will have easements <br />from Boulder County Open Space and an adjacent land owner to construct the delivery pipeline. <br />5.3 PROJECT IMPLEMENTATION SCHEDULE <br />Table 5-1 is the schedule for implementing this project. <br />Table 5-1 <br />Project Implementation Schedule <br />~~~ <br />~~~ <br />Date Action <br />October 2008 Submit Feasibility Study to CWCB <br />November 2008 Complete the Design Revisions <br />December tart Construction <br />May~969~ Q l Complete Construction <br />5.4 COST ESTIMATE <br />The estimate of construction associated with the selected alternative is based on the present <br />Contractor's estimated cost escalated to reflect the construction climate at the time of the <br />submission of this report. URS also added 30% contingency for the revised design which will be <br />completed by November 2008. Table 5-2 summarizes the costs estimated for this project. <br />~S 5-1 <br />