My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC02181
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC02181
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/10/2011 11:10:17 AM
Creation date
12/2/2008 10:05:29 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150276
Contractor Name
Center of Colorado Water Conservancy District
Contract Type
Loan
Water District
0
County
Park
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
134
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
CWCB Construction Fund Loan Application <br />progress for the proposed project. Please submit one copy of each completed study with this <br />application. <br />The James Tingle Reservoir has been fully designed and approved by the State <br />Engineer and Park County, and the construction has commenced. Completion is <br />scheduled to occur by approximately 12/31/2008. Copies of the construction plans for <br />the James Tingle Reservoir and the State Engineer's approval of the design are <br />attached as Appendices C-1 and C-2. <br />9. Estimated cost of the project. Please include estimated engineering costs, and estimated <br />construction costs, if kriown:** <br />Engineering Costs: <br />Construction Costs: <br />Other Costs: <br />**Total Costs: <br />$ 560,000.00 (Deere & Ault, contract awarded) <br />$ 2,898,000.00 (contract awarded to Cat Lake Constr. <br />for $2,635,000.00 -above cost includes a 10% contingency) <br />$104,490.00 (rehabilitation of Randall and Sessions <br />Ditches -ACC Construction) <br />$ 3,562,490.00 <br />** Costs for this project are shared with Centennial with Center of Colorado paying 14% <br />and Centennial paying approximately 86%, thus Center of Colorado's anticipated costs <br />are approximately $498,749.00. <br />Copies of the Deere & Ault budget, the Cat Lake Construction award and the ACC <br />Construction "Contract Purchase Order" are attached as Appendices C-3, C-4 and C-5, <br />respectively. The ACC Construction contract for rehabilitation of the Randall and <br />Sessions Ditches is mostly completed as of the date of this application. <br />10. Loan amount and terms you are requesting. <br />Requested Loan Amount: $500,000.00 <br />Term (length) of loan: 10 years <br />Interest Rate: 3% to 3.5% <br />Part C. -Project Sponsor Financial Information <br />(Usually 75-90 % of Est. Total Costs) <br />(Usually 10, 20, or 30 years) <br />(Please call for our current rates) <br />Because the CWCB Construction Fund is a revolving fund, it is important that the project sponsor <br />have the financial capacity to repay any loans made by the CWCB. The following information is <br />needed to assist the CWCB in a preliminary assessment of the applicant's financial capacity. It is <br />also requested that the project sponsor submit with this application, copies of the three most recent <br />annual reports, financial statements, corporate reports or other current documentation of fmancial <br />condition and operations. <br />1. List any existing long-term liability (multi-year) or indebtedness that exceeds one thousand <br />dollars. For example, bank loans, government agency loans, bond issues, accounts payable, etc. <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.