My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
25c
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
25c
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:37:43 PM
Creation date
11/13/2008 10:46:38 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/19/2008
Description
CF Section - Changes to Existing Loans - Bijou Irrigation District - Empire Res. East Embankment Dam Repair
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Financial Analysis <br /> <br />Table 2 is a summary of the financial aspects of the project. The CWCB loan will be repaid <br />from annual acreage assessments. The land currently assessed by the District is 19,177 acres. <br /> <br />Table 2 . Financial Summary <br />Total Project Cost $ 4,900,000 <br />CWCB Loan Amount $ 4, 410,000 <br />CWCB Loan Amount (Including 1% Service Fee) $ 4,454,100 <br />CWCB Loan Payment $ 205,776 <br /> CWCB Loan Payment (Including 10% Reserve) $ 226,3 54 <br />Previous Assessment per acre ( 2007) $46.58 <br />Approved 2008 Budget Assessment per acre $46.58 <br />Annual Cost of Loan per acre - foot delivered (19,900 ac - ft.) $ 11.37 <br />Annual Cost of Loan per acre Assessed (19,177) $ 11.80 <br />Number of Ac res Assessed 19,177 <br /> <br />Assessment Levy History / acre : 2009 - $46.58; 2008 - $46.58 ; 2007 - $18 ; 2006 - $13 ; <br />2005 - $10 ; 2004 - $10 . <br /> <br />Creditworthiness : The District has three existing loans with the CWCB, summarized as follows <br />in Table 3: <br />Table 3 <br /> <br />Loa n Amount Borrowed Balance Annual Payment <br />Empire Res. - Spillway $723,950 715,000 $38,354 <br />Diversion Structure $2,090,700 $2,090,700 $106,248 <br />Empire Res. E. Dam $4,454,100 $4,454,100 $226,354 <br /> <br />$7,268,750 $7,259,800 $370,956 <br />Totals <br /> <br /> <br />s annual assessment to each member breaks down the cost per acre necessary to <br />cover each The <br />Dis down for 200 8 and 2009 is summarized below: <br /> <br />2008 2009 <br /> <br />Category Cost/Acre Cost/Acre <br /> <br />Operating Expenses $40.00 $27.44 <br /> Spillway Loan $2.00 $1.80 <br /> Diversion Loan $1.72 $5.54 <br />East Dam Rehabilitation (This loan) $2.86 $11.80 <br /> <br /> <br /> Totals: $46.58 $46.58 <br /> <br />It is the intent of the District to maintain the 2008 assessment rate of $46.58 per acre for 2009 , by <br />increasing the asse ssments for the loans that are proposed to increase, as identified above , and <br />redu cing the assessments f or annual operating expenses. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.