<br /> <br /> <br />T he reconstruction of East D am is currently on a time and materials contract with Builders <br />Aggregate, from Fort Morgan, Colorado, and Chilson Excavating, from Weldona , Colorado. <br />The District elected to go with a time and materials contract given the urgency and the extent of <br />unknow ns associated with the time and material necessary to place the temporary dam <br />embankment. The two companies, given their availability and location, were selected by the <br />District to perform the temporary fill placement and based on their performance were also <br />selected to perform the remaining dam work. The companies provided hourly equipment rates <br />in December of 2007 f or the temporary dam work that have increased by approximately 20%, <br />due to increase fuel and labor costs. Additionally the costs of rip rap and bedding material have <br />increased significantly since the original estimate. These fluctuations in equipment, labor, fuel, <br />and materi al costs have added approximately $400,000 to the project. <br /> <br />A comparison of the total cost of the project with that originally estimated is summarized below in <br />Table 1. Applegate Group, Color ado, completed the cost est imate for the project in December of <br />2007 . The estimated total cost of the project at the t ime of loan approval was $2,650,000 . <br /> <br />Table 1 <br /> <br /> <br />Construct ion Items Original Est. Nov. 2008 Est. <br />1 . Mobilization $ 150,000 $75,660 <br />2 . Rip Rap & Placement $876,490 $1,882,017 <br />3 . Bedding & Placement $ 542,870 $705,040 <br />4 . Excavation and Hauling $319,760 $394,250 <br />5. Backfill and Compaction $580,88 0 $257,040 <br />6. Sink Hole Repair $0 $4,000 <br />7. Access Road Repair $0 $18,100 <br />8. Parapet Wall Removal $0 $18,750 <br />9. Tree and Root Removal $80,000 $55,000 <br />10. Temporary Dam Embankment $0 $385,620 <br />11. Contingency $0 $567,450 (15%) <br />12. Surveying/E ng./Testing/Inspection $100,000 (4%) $537,073 (14%) <br /> <br />$ 2,650,000 $4,900,000 <br />Totals: <br /> <br /> <br />The main cost overruns associated with the project w ere : the placement of temporary dam <br />embankment material, removal of the concrete parapet wall and its reconfigurat ion, increased <br />material and fuel costs, and increased engineering and construction inspection costs. These items <br />cost the District approximately $1,683,000 in additional funds to complete the project as <br />reconfigured. Additionally, the engineer has budge ted an additiona l $567,450 in contingencies <br />( 15 % of the revised construction costs ) to a ccount for the overall project co st overrun of $2,25 0,000. <br /> <br />The District is requestin g an increase of $2, 045,250 to its cu rrent loan authorization $2,408,850 , to <br />cover 90% of the total cost of the project. The new total amended loan amount for the District <br />w ould be $ 4,454,100 , at the ir original interest rate of 2. 2 5 % for 3 0 years. The new annual payment <br />will be $ 226,354 , which includes the 10% reserve requirement. The Company current loan of <br />$ 2,408,850 has an annual pay ment of $126,598. <br /> <br />3 <br />