My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11d (2)
CWCB
>
Board Meetings
>
DayForward
>
1-1000
>
11d (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 2:34:35 PM
Creation date
11/13/2008 9:38:06 AM
Metadata
Fields
Template:
Board Meetings
Board Meeting Date
11/18/2008
Description
CWCB Director's Report
Board Meetings - Doc Type
Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
85
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Creek basin, on the instream flow program, on a synthetic hydrologic model developed by Michelle <br />Garrison, and on the Colorado Water Conservation Board's objectives, generally. Ted Kowalski and <br />Linda Bassi, continue to provide support and state resources towards this process. The next RPW public <br />meeting will be on December 2 at 6:30 p.m. (Ted Kowalski) <br />RIO GRANDE DECISION SUPPORT SYSTEM (RGDSS): The Bureau of Reclamation has <br />requested the Division of Water Resources help in using the RGDSS groundwater model in assisting them <br />in their future planning effort relating to the Closed Basin Project. (Ray Alvarado) <br />DOLORES RIVER DIALOGUE (DRD) UPDATE: Since the last Board meeting, the DRD <br />Technical Committee met on September 25 and November 4, 2008, and the full DRD group met on <br />October 28, 2008. Agenda items for the full DRD meeting included discussions o£ (1) the process to <br />update the Lower Dolores River Management Plan as an alternative to Wild and Scenic designation on <br />the Dolores River below McPhee Reservoir; (2) a section 319 watershed study being conducted on the <br />Dolores River and how it relates to item (1); (3) management by the USBR and the Dolores Water <br />Conservancy District of the 2008 spill of McPhee Reservoir; and (4) ongoing scientific research on the <br />Dolores River. At the November 4, 2008 DRD Technical Committee meeting, participants worked on <br />developing a public process and schedule for the Lower Dolores River Management Plan update. The <br />process will entail several public meetings, with the first meeting tentatively set for mid-December. The <br />desired outcome of this process is the formulation of recommendations on how to protect the ORVs <br />identified by the USFS/BLM on the lower Dolores River to submit to the USFS/BLM for consideration in <br />the Environmental Assessment related to the Wild and Scenic process. (Linda Bassi) <br />RECENTLY DECREED ISF WATER RIGHTS: On August 14, 2008 the Division 4 Water <br />Court decreed an instream flow water right to the CWCB on the North Fork Escalante Creek in Case No. <br />07CW036 for 3.7 cfs (April 1 -June 14), and 0.6 cfs (June 15 -March 31), with an appropriation date of <br />January 25, 2006. The upstream terminus is the confluence with Points Creek and the lower terminus is <br />the headgate of the Sawtell Ditch. The ISF reach is approximately 7.3 miles long. The CWCB entered <br />into a stipulation with the Mika Ag Corporation to alleviate their concerns about this ISF segment. <br />On August 29, 2008 the Division 4 Water Court decreed an instream flow water right to the CWCB on <br />the Little Dolores River in Case No. 04CW 158 for 2.4 cfs (April 1 -June 30), 1.6 cfs (July 1 -October <br />31), and 1.0 cfs (November 1 -March 31), with an appropriation date of January 28, 2004. The upstream <br />terminus of the ISF reach is the confluence with Bieser Creek and the lower terminus is the Upper <br />Saxbury Ditch. The ISF reach is approximately 2.5 miles long. <br />On September 19, 2008 the Division 4 Water Court decreed an instream flow water right to the CWCB on <br />Pauline Creek in Case No. 07CW201 for 2.0 cfs (April 1 - Apri130), 2.75 cfs (May 1 -June 30), 2.0 cfs <br />(July 1 -August 31), and 1.0 cfs (September 1 -September 30), with an appropriation date of January 24, <br />2007. The upstream terminus is the confluence with Chavez Creek and the lower terminus is the headgate <br />of Tarbell and Alexander Ditch. The ISF reach is approximately 4.1 miles long. <br />On September 19, 2008 the Division 4 Water Court decreed an instream flow water right to the CWCB on <br />Escalante Creek in Case No. OSCW250 for 3.20 cfs (March 1 -March 31), 11.50 cfs (April 1 -June 14), <br />3.20 cfs (June 15 -July 31), and 1.30 cfs (August 1 -February 28) with an appropriation date of January <br />25, 2005. The upstream terminus is the confluence with the East Fork and Middle Fork Escalante Creek <br />~~~~ 21 ,w <br />~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.