My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150230 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150230 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:28:19 AM
Creation date
9/30/2008 1:53:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150230
Contractor Name
Lincoln Park Crooked Ditch Company
Contract Type
Loan
Water District
12
County
Fremont
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />1 <br />I <br /> <br />Cost Estimate <br /> <br />Season One <br /> <br />15,365 LF Replacement <br /> <br />Surveying <br /> <br />ROW Establishment <br />Elevations of flowline and exist. ground <br />Pipe alignment <br />Locate ROW obstacles <br />Plat & record ROW <br /> <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br /> <br />Design - 2 Engineers <br /> <br />Plan & Profile <br />Specifications <br />Bidding & Awarding Contracts <br /> <br />Construction Management - 1 season <br />Supervision - 120 days per season <br />Change orders, payouts, weekly contract. meetings <br />Monthly Board meetings <br />Close out documents and As-Builts <br /> <br />Full Time On Site Inspection (10 hrs/day) <br /> <br />#1 Replace 3450 LF of pipe 36E <br />Extra fill and compaction - 13,055CY <br />and other items <br /> <br />#2 Replace 2630 LF of pipe 18A <br />and other items <br /> <br />#3 Replace 6935 LF of pipe 36J thru M <br />and other items <br /> <br />#4 Replace 18H & 181 pipe 2350 LF <br /> <br />Replace 3 Splitters and gates <br />Remove 3 splitters and gates <br />Replace 3 Splitters and gates <br /> <br />HOPE <br />Moore's Earthmoving <br />Costs <br />Stillwater Eng. Costs <br /> <br />$67,500.00 <br /> <br />$46,000.00 <br /> <br />$66,000.00 <br /> <br />$166,980.00 <br /> <br />$130,867.00 <br /> <br />$365,079.00 <br /> <br />$44,650.00 <br /> <br />$12.000.00 <br /> <br />RCP <br />Moore's Earthmoving <br />Costs <br />Stillwater Eng. Costs <br /> <br />$67,500.00 <br /> <br />$46,000.00 <br /> <br />$66,000.00 <br /> <br />$261,855.00 <br /> <br />$203,192.00 <br /> <br />$526,367.00 <br /> <br />$70.500.00 <br /> <br />$12,000.00 <br /> <br />Totals <br /> <br />$1,253,414.00 <br /> <br />May 2006 <br /> <br />Lincoln Park Crooked Ditch Company <br /> <br />$899,076.00 <br /> <br />Cost Estimate II <br />
The URL can be used to link to this page
Your browser does not support the video tag.