My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C150230 Feasibility Study
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
C150230 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/7/2011 9:28:19 AM
Creation date
9/30/2008 1:53:26 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150230
Contractor Name
Lincoln Park Crooked Ditch Company
Contract Type
Loan
Water District
12
County
Fremont
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
51
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />1 <br />I <br />I <br /> <br />Season Two <br /> <br />I <br />I <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />I <br />I <br /> <br /> HOPE RCP <br /> Moore's Earthmoving Moore's Earthmoving <br /> 14,860 LF Replacement Costs Costs <br /> Stillwater Eng. Costs Stillwater Eng. Costs <br />#5 Replace 4950 LF of pipe 36F thru I $259,655.00 $395,780.00 <br /> and other items <br />#6 Replace 3740 LF of pipe 36N thru Q $220,066.00 $324,675.00 <br /> and other items <br />#7 Replace 36R , 600 LF $222,453.00 $316,503.00 <br /> and other items <br /> And Replace open concrete ditch. <br /> CD1 & 2 with 36" Pipe, 3,570 If <br />#8 Replace 36A thru D 2000LF $112,750,00 $167,750.00 <br /> and other items <br />#9 Replace/Move Silt Pond $40,000.00 $40,000.00 <br /> Remove old silt pond <br /> Install new silt pond <br /> Replace/Move Weir $5,000.00 $5,000.00 <br /> Remove weir box <br /> Install new weir box <br /> Construction Management - 2nd season <br /> Supervision - 120 days per season <br /> Change orders, payouts, weekly contract. meetings <br /> Monthly Board meetings <br /> Close out documents and As-Builts <br /> Full Time On Site Inspection (10 hrs/day) $66,000.00 $66,000.00 <br /> Totals $925,924.00 $1,315,708.00 <br /> <br />May 2006 <br /> <br />Cost Estimate <br /> <br />12 <br /> <br />Lincoln Park Crooked Ditch Company <br />
The URL can be used to link to this page
Your browser does not support the video tag.