<br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />I <br />1 <br />I <br />1 <br />I <br />I <br />I <br />I <br />I <br />I <br />1 <br />1 <br />I <br /> <br />Selected Alternative <br /> <br />The selected alternative, Alternative No.2, involves construction of a replacement LPCDC diversion <br />structure. This structure will replace the existing piping, where the current piping will be excavated and <br />removed. New HDPE piping will be installed in the excavated ROW. <br /> <br />Stillwater Engineering will provide surveying, engineering, and construction observation services to render <br />a detailed design, bid package, and construction oversight for this project. <br /> <br />The estimated cost of the completed project is $2 million. The cost breakdown is summarized in the <br />following section. <br /> <br />May 2006 <br /> <br />Selected Alternative <br /> <br />10 <br /> <br />Lincoln Park Crooked Ditch Company <br />