My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Ducks Unlimited Lower SP Water Protection and Wetland Restoration_C150432 Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Ducks Unlimited Lower SP Water Protection and Wetland Restoration_C150432 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2013 12:49:17 PM
Creation date
9/16/2008 4:46:36 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
South Platte
Applicant
Ducks Unlimited, Inc.
Description
South Platte Water Protection and Wetland Restoration Project
Account Source
Statewide
Board Meeting Date
9/17/2008
Contract/PO #
C150432
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account - Grant Application Form <br />Fonn Revised May 2007 <br />I Total Grant Request I <br />Labor Other Direct (If Total Grant <br />Costs Applicable) Costs <br />Task 1 - $0 $251,201 $131,201 $120,000 <br />(Specifi- <br />name of task) <br />In-Kind $0 $0 <br />Contribution <br />s <br />Total Costs: I I 1 1 $120,000 <br />.Contribution Sources <br />Project Task Grant $$ Match $$ Source Match In-kind Source Total <br />Task 1 $120,000 $120,000 <br /> $12,000 Landowner $12,000 <br /> $59,201 NAWCA IV $59,201 <br /> $60,000 CDOW $60,000 <br /> <br />Total $120,000 $131,201 $0 $251,201 <br />ESTIMATE OF CONSTRUCTION COSTS <br />BRIDGE FARM WITHDRAWAL STRUCTURE <br />PROJECT NUMBER 1007050 <br /> TOTAL <br />TASK DESCRIPTION COST <br />FINAL DESIGN, PRE-CONSTRUCTION MEETING & CONSTRUCTION MANAGEMENT <br /> SUBTOTAL $12,331 <br />CONSTRUCTION MANAGEMENT & CONSTRUCTION OBSERVATION <br /> SUBTOTAL $17,772 <br />PRE- AND POST-CONSTRUCTION SURVEYS <br /> SUBTOTAL $3,000 <br />PERMITTING <br /> SUBTOTAL $3,000 <br />PUMP & PUMP INSTALLATION @ SUMP (Superior <br />Irrigation) <br /> SUBTOTAL $13,145 <br />PUMP & PUMP INSTALLATION @ AUGMENTATION POND (Superior Irrigation) <br /> SUBTOTAL $12,145 <br />CONTROLS (Product Level Control) <br /> SUBTOTAL $7,385 <br />POND & PIPELINE EXCAVATION, PIPE INSTALLATION, BACKFILL & COMPAC TION (Platinum) <br /> SUBTOTAL $115,556 <br />34
The URL can be used to link to this page
Your browser does not support the video tag.