Laserfiche WebLink
Water Supply Reserve Account - Grant Application Form <br />Fonn Revised May 2007 <br />I Total Grant Request I <br />Labor Other Direct (If Total Grant <br />Costs Applicable) Costs <br />Task 1 - $0 $251,201 $131,201 $120,000 <br />(Specifi- <br />name of task) <br />In-Kind $0 $0 <br />Contribution <br />s <br />Total Costs: I I 1 1 $120,000 <br />.Contribution Sources <br />Project Task Grant $$ Match $$ Source Match In-kind Source Total <br />Task 1 $120,000 $120,000 <br /> $12,000 Landowner $12,000 <br /> $59,201 NAWCA IV $59,201 <br /> $60,000 CDOW $60,000 <br /> <br />Total $120,000 $131,201 $0 $251,201 <br />ESTIMATE OF CONSTRUCTION COSTS <br />BRIDGE FARM WITHDRAWAL STRUCTURE <br />PROJECT NUMBER 1007050 <br /> TOTAL <br />TASK DESCRIPTION COST <br />FINAL DESIGN, PRE-CONSTRUCTION MEETING & CONSTRUCTION MANAGEMENT <br /> SUBTOTAL $12,331 <br />CONSTRUCTION MANAGEMENT & CONSTRUCTION OBSERVATION <br /> SUBTOTAL $17,772 <br />PRE- AND POST-CONSTRUCTION SURVEYS <br /> SUBTOTAL $3,000 <br />PERMITTING <br /> SUBTOTAL $3,000 <br />PUMP & PUMP INSTALLATION @ SUMP (Superior <br />Irrigation) <br /> SUBTOTAL $13,145 <br />PUMP & PUMP INSTALLATION @ AUGMENTATION POND (Superior Irrigation) <br /> SUBTOTAL $12,145 <br />CONTROLS (Product Level Control) <br /> SUBTOTAL $7,385 <br />POND & PIPELINE EXCAVATION, PIPE INSTALLATION, BACKFILL & COMPAC TION (Platinum) <br /> SUBTOTAL $115,556 <br />34