Laserfiche WebLink
Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br />BRIDGE FARM <br />Tack 1 <br />• Description of task: Restore Wetlands <br />Method or procedure that will be used or followed to accomplish the task and identifv who Avill undertake the <br />task: <br />Paragon Consulting Nvill complete a survey and desib 1 for the impacted area, identified on the attached map. A <br />topographic survey Nvill be developed using Trimble GPS technology. From the survey, reaps will be produced <br />using AutoCAD 2007 which will illustrate the 6" or 12" contours of the micro topography. Paragon's <br />professional engineers Nvill work with DT Ranch, to provide a detailed design of Nvetland impoundments, water <br />level control structures, and water delivery infrastructure, including pipeline and well design. <br />The landowner voll oversee construction of the project via a site-specific agreement with Ducks Unlimited. The <br />project wall need to follow all federal and state rules for procurement of any and all contractors. <br />• Description of the major deliverables/products that will be produced upon successfiil completion of the task: <br />Complete Project Specification including: <br />• Survey and Design <br />• Water Court Filing and TWSSP <br />• Construction Bid Package <br />• Construction of all infrastructure <br />• Final As-built drawings <br />IL Personnel <br />Ducks Unlimited, Inc. <br />Program Manager -Greg Kemohan <br />Regional Biologist - Matt Reddy <br />Regional Engineer - Richard Vail, P.E. <br />Qualifications - Ducks Unlimited Avill submit a complete statement of qualifications to <br />accompany this application upon submission to the CWCB. <br />Paragon Consulting - David Rau, President <br />Landowner - Mark Vissering <br />Several contractors and other engineers and legal professionals will be included to update the application as Nve <br />continue to develop the project. <br />III. Budget <br />33