My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
South Platte - Ducks Unlimited Lower SP Water Protection and Wetland Restoration_C150432 Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
METRO - SOUTH PLATTE
>
South Platte - Ducks Unlimited Lower SP Water Protection and Wetland Restoration_C150432 Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/25/2013 12:49:17 PM
Creation date
9/16/2008 4:46:36 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
South Platte
Applicant
Ducks Unlimited, Inc.
Description
South Platte Water Protection and Wetland Restoration Project
Account Source
Statewide
Board Meeting Date
9/17/2008
Contract/PO #
C150432
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
49
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account - Grant Application Form <br />Form Revised May 2007 <br />ELECTRICAL SERVICE (Xcel Energy) <br />SUBTOTAL $18,000 <br />ON-SITE ELECTRICAL WIRING <br />SUBTOTAL $7,000 <br />Note: A cost savings of approximately $13,000 would be realized <br />if a nearby 240 volt, single phase electrical service from Xcel <br />Energy could be used in lieu of a 480 volt, three phase service; <br />however, the pump motor will not operate as efficiently. TOTALS $209,334 <br />CONTINGENCY $41,867 <br />Total $251,201 <br />IV. SCHEDULE <br />Project Timeline <br />Jan 1, 2009 - December 31, 2009 <br />Project <br />Component Jan-March April-June Jul-Sept Sept-Dec <br />Task 1 x <br />Hawk Sprints <br />All of the water court filings and survey and design have been completed. <br />Task 1 <br />• Description of task: Construct wetland Impoundments via contour levees, and Install water level control <br />structures. Contract construction components to eligible parties. Provide construction management <br />oversight through to project completion. <br />• Method or procedure that will be used or followed to accomplish the task and identify who will undertake the <br />task: Levee construction: Ducks Unlimited will oversee project delivery through completion of the project. <br />Contractors will be selected through competitive bid processes as directed by federal guidelines. All permits <br />and clearances will be attained prior to constriction. <br />• Description of the major deliverables/products that will be produced upon successful completion of the task: <br />Ducks Unlimited will deliver a completed project including: <br />• Survey and Design <br />• Construction Bid Package <br />• Construction of all infrastiucture <br />• Final As-built drawings <br />IL Personnel <br />Ducks Unlimited, Inc. <br />Program Manager -Greg Kernohan <br />Regional Biologist - Matt Reddy <br />Regional Engineer -Richard Vail, P.E. <br />Qualifications - Ducks Unlimited will submit a complete statement of qualifications to <br />accompany this application upon submission to the CWCB. <br />35
The URL can be used to link to this page
Your browser does not support the video tag.