My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Colorado - Battlement Reservoir #3_Application
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Colorado - Battlement Reservoir #3_Application
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2012 10:16:03 AM
Creation date
9/16/2008 2:49:09 PM
Metadata
Fields
Template:
WSRA Grant and Loan Information
Basin Roundtable
Colorado
Applicant
Trout Unlimited Inc, Grand Valley Anglers
Description
Battlement Reservoir #3 Dam Reconstruction
Account Source
Basin
Board Meeting Date
9/1/2008
Contract/PO #
11000000126
WSRA - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Water Supply Reserve Account -Grant Application Form <br />Form Revised May 2007 <br />III. Budget <br />A detailed budget by task, which includes the level of effort (hours) and rates. Any unit costs or other direct <br />costs must be specified (i.e. mileage, number of miles, dollars per mile). For an example budget format -See <br />Attachment 1 at the end of this application. <br />If applicable, the budget should also detail the source and amount of matching funds and/or in-kind <br />contributions, if any. If applicable, the budget should also include any other outstanding or previously <br />applied for funding that also supports the water activity: <br />Total Costs <br /> Matching Funds <br /> with Award of Water Supply <br /> FIF Reserve Account <br /> Labor Total Pro'ect Costs Grant Total Pro'ect Costs <br />Task 1- Removal of existing NA $80,000 $60,000 (75%) $20,000 (25%) <br />outlet structure <br />Task 2 - Construction of NA $300,000 $250,000 (83%) $50,000 (17%) <br />permanent, hardened spillway <br />Task 3 - Outsloping downstream NA $15,000 $8,000 (53%) $7,000 (47%) <br />slo e of dam <br />Task 4 - Revegetation of NA $5,000 $2,000 (40%) $3,000 (60%) <br />disturbed areas <br /> <br />Total Costs: $400,000 $320,000 (80%) $80,000 (20%) <br />IV. Schedule <br />A detailed project schedule including key milestones and the dates these are expected to be completed. <br />June 2008 -June 2009: Complete any further required design and engineering work (not anticipated) and <br />begin arrangement of project logistics <br />July 2009: Task 1-Remove existing outlet structure at Battlement Reservoir #3 by July 3 1, 2009 <br />July 2009 -August 2009: Task 2 -Complete construction of permanent, hardened spillway at Battlement <br />Reservoir #3 by August 31, 2009 <br />August 2009 -September 2009: Task 3 and Task 4 -Complete outsloping of the downstream slope of the <br />dam, and revegetation of disturbed sites at Battlement Reservoir #3 by September 30, 2009 <br />October 1, 2009: Open public fishing access to Battlement Reservoir #3 by this date <br />6. Water Availability and Sustainability -this information is needed to assess the viability and effectiveness of <br />9
The URL can be used to link to this page
Your browser does not support the video tag.