Laserfiche WebLink
<br />I LS Mobilization $2,500.00 $2,500.00 <br />1 LS Construction Zone Traffic Control $1,000.00 $1,000.00 <br />255 CY Rock Excavation (5% of Trench) $22.00 $5,610.00 <br />1 LS Removal of Strictures and Obstructions $2,000.00 $2,000.00 <br />465 TONS 3/4" Washed Rock Bedding (5% of Trench) $15.00 $6,975.00 <br />465 TONS Select (Imported) Bedding Material (5% of Trench) $17.00 $7,905.00 <br />10.200 LF 6" Dia. HDPE Water Main $12.50 $127,500.00 <br />400 LF 10" Dia. Insulated Casing $30.00 $12,000.00 <br />200 LF Boar 10" Dia. Casing & 6" Carrier pipe under Hwy 96 $125.00 $25,000.00 <br />24 EA. Seivice Tie his $850.00 $20,400.00 <br />1 EA. Tie into existing main on LL.5 $1,800.00 $1,800.00 <br />1 EA. 6"Solid Sleeve $500.00 $500.00 <br />6 EA. 6" Valve $1,750.00 $10,500.00 <br />1 LS Miscellaneous Fittings $10,000.00 $10,000.00 <br />1 EA. Connection to Existing 8" Dia. Main $1,500.00 $1,500.00 <br />11,000 LF Tracer Wire $0.10 $1,100.00 <br />1 LS Construction Surveying $3,500.00 $3,500.00 <br />1 LS "As-Built" Plans $3,500.00 $3,500.00 <br /> <br />Subtotal $243,290.00 <br /> <br />Contingency (15%) $36,493.50 <br /> <br />Consulting & Legal Fees (20%) $48,658.00 <br /> <br />GRAND TOTAL $328,441.50 <br />Schedule: <br />Work Task 1-Jan-07 1-Apr-07 1-Jul-07 1-Oct-07 1-Jan-08 1-Apr-08 1-Jul-08 1-Oct-08 1-Jan-09 <br /> <br />Prepare PER YTG <br />Prepare & Submit Funding Application to <br />Arkansas River Basin Roundtable <br />Obtain CWCB recommendation <br />Commence Data Collection & Design <br />Bid Project & Award Contract <br />Commence Construction Activity <br />Final Inspection & Close Out <br />Suggested Format for Scope of Work