My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Arkansas - Fowler Install of Portable Wtr Delivery Main Backfeedline_Application 2
CWCB
>
WSRF Grant & Loan Information
>
DayForward
>
ARK - GUNNISON
>
Arkansas - Fowler Install of Portable Wtr Delivery Main Backfeedline_Application 2
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/22/2009 2:20:55 PM
Creation date
9/16/2008 2:12:30 PM
Metadata
Fields
Template:
WSRF Grant Information
Basin Roundtable
Arkansas
Applicant
Town of Fowler
Description
Installation of a Potable Water Supply Main for the Town of Fowler
Account Source
Basin & Statewide
Board Meeting Date
9/17/2008
WSRF - Doc Type
Grant Application
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The scope of work will form the basis for the contract between the Applicant and the State of Colorado. In <br />short, the Applicant is agreeing to undertake the work for the compensation outlined in the scope of work and <br />budget, and in return, the State of Colorado is receiving the deliverables/products specified. Summarized <br />below is a suggested format for the Scope of Work. <br />1. Task 1 <br />• Description of task: <br />• Method or procedure that will be used or followed to accomplish the task and identify who will <br />undertake the task: <br />• Description of the major deliverables/products that will be produced upon successfitl completion <br />of the task: <br />Task 2 (Repeat the above format for each task) <br />II. Personnel <br />Provide a list of key water activity/project participants and their qualifications to accomplish the <br />water activity/project If specific individuals or firms have not vet been identified indicate the types <br />of expertise that will be sought (i.e. professional engineering fret, registered land surveyor, aquatic <br />biologist etc.). <br />III. Bud6et <br />A detailed budget by task which includes the level of effort (hours) and rates. Anv unit costs or <br />other direct costs must be specified (i.e. mileage, number of miles, dollars per mile). For an example <br />budget format - See Attachment 1 at the end of this application. <br />If applicable, the budget should also detail the source and amount of matching funds and/or in-kind <br />contributions. if any. If applicable, the budget should also include any other outstanding or <br />previously applied for fiinding that also supports the water activity: <br />IV. Schedule <br />A detailed project schedule including key milestones and the dates these are expected to be <br />completed. <br />NOTE: Costs incurred prior to execution of a contract or purchase order are not <br />subject to reimbursement. <br />6. Water Availability and Sustainability - this information is needed to assess the viability and <br />effectiveness of the water project or activity. Please provide a description of each water supply <br />source to be utilized for, or the water body to be affected by, the water activity. For water supply <br />sources being utilized, describe its location, yield, extent of development, and water right status. For <br />10
The URL can be used to link to this page
Your browser does not support the video tag.