<br />Cost Estimate <br /> <br />The Mesa County Office of the NRCS is in the process of completing a <br />design for preparation for the start of construction in the fall of 2008. The <br />NRCS will not revise cost estimates until the bidding process begins now <br />scheduled for September 2008, however the Headgate 135 Lateral, Inc. <br />provided a preliminary cost estimate from Sorter Construction. The NRCS <br />Preliminary Design report and detailed cost estimate are included in Appendix <br />C. The estimated cost of the Project is $ 256,645.00. The cost breakdown is <br />summarized in Table 1. <br /> <br />Table 1 Headgate 135 Lateral, Inc. Pipeline Projeet- NRCS Cost <br />Estimate <br /> <br />Item <br /> <br />Amount S <br /> <br />Engineering/Planning NRCS No/Cost <br />Construction $ 256,645.00 <br />Total $ 256,645.00 <br /> <br />Implementation Schedule <br /> <br />The NRCS is expected to complete the final design by September 2008. <br />Construction is expected to begin November 2008 and to be completed by <br />April 2009. <br /> <br />Permitting <br /> <br />All easements and rights of way belong to the Headgate 135 Lateral, Inc. and <br />no additional permits are required. <br /> <br />7 <br />