My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01841 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01841 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/8/2011 12:52:40 PM
Creation date
8/11/2008 11:56:44 AM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150270
Contractor Name
Headgate 135 Lateral, Inc.
Contract Type
Loan
Water District
0
County
Mesa
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Institutional Considerations <br /> <br />Entities that are, or maybe, involved in the design, construction, and financing <br />of the project: <br /> <br />Headgate 135 Lateral Inc.; financing, construction and project managing. <br />Natural Resources Conservation Service (NRCS); design, construction <br />supervision and inspection. <br />Grand Valley Drainage District; construction material and labor and <br />machinery. <br />Bishop of Pueblo; pay for drainage cost and cost share financing for irrigation <br />piping on north side of our project. <br />3P Development, LLC; cost share financing for irrigation piping on west side <br />of our project. <br />Colorado Water Conservation Board (CWCB); financing. <br />Mesa Conservation District (Mesa C. D.); cost share <br />The Headgate 135 Lateral, Inc, will be the construction manager for the <br />project and will be the entity entering into contracts and agreements for the <br />services to be provided. <br /> <br />Financial Analysis <br /> <br />Headgate 135 Lateral, Inc. is applying for a loan from the CWCB in the <br />amount of $260,000.00, to cover total cost of all construction and materials. <br />Upon final approval of the constructed Project by NRCS, Mesa C.D. will pay <br />Lateral 135 $70,663.75 which will used by the Lateral to pay down the loan. <br />Participates payment from the Bishop of Pueblo and The 3P Development, <br />LLC is expected within 30 days following completion of the project. <br /> <br />Entitv Grant/cost sbare Constr.loan Lonp-term loan <br />ewCB $ 0 $ 260,000.00 $ 134,000.00 <br />Mesa Conser. Dist. $ 70,663.75 $ 0 .0 <br />Bishop of Pueblo $ 34,000.00 .0 $ 0 <br />Grand Valley Drainage $13,417.00 $ 0 $0 <br />3P Development, LLC . 7,115.00 . 0 .0 <br />Headgate 135 $ 0 $ 0 $ 0 <br />Total $125,205.75 $ 260,000.00 $ 134,000.00 <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.