Laserfiche WebLink
<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br /> <br /> <br />GRAND VALLEY DRAINAGE DISTRICT <br />72223 Road - P.O. Box 969, Grand Junction, Co. 81502-0969 <br />(970) 242-4343 <br /> <br />March 24, 2008 <br /> <br />Gordon Barker, President <br />and Lateral 135 Board <br />3042 Belford Court <br />Grand Junction, CO 81504 <br /> <br />RE: Request for Assistance <br /> <br />Gentlemen: <br /> <br />We thank you for your written request for assistance. The Board of Directors of the Drainage <br />District appreciates a group making good faith effort to correct a situation on their own rather <br />than demanding that some agency rush to their side and make the problem go away. <br />Consequently the Board gave time and attention, reviewed your request, and then directed staff <br />to provide detailed estimates of materials, time, and labor for the District to consider. <br /> <br />Based upon a District survey of the site between Grand Valley Drive and Fruitwood Drive from E <br />Road south toward Gunnison Avenue the District's surveyor estimated somewhat less than 50% <br />of the volume of material originally requested. The equipment and personnel effort to transport, <br />fill, and level that material was estimated and costs assigned. <br /> <br />Based upon your successful plan of attaining other assistance for materials and installation <br />costs the Board decided to make the following offer. <br /> <br />1. The District is willing to assist Lateral 135 with the filling of the existing combination <br />headwater I wastewater ditch south of E Road. Drainage District personnel will load and <br />transport the fill material to the site, use District equipment to fill the existing combination <br />headwater I wastewater ditch, level the fill material so a. District trucks can back down <br />between the fences to unload the material and b. the contractor your group chooses may <br />get equipment in the easement area to lay pipes according to the plan identified in your <br />letter of February 25, 2008. Such transport of material and subsequent leveling would <br />occur after irrigation water is out of the ditches. Conditional upon Lateral 135 <br />acceptance of the stipulations below the work will be scheduled for completion before <br />November 30, 2008. <br /> <br />2. District estimates that the loaders, tandem axle dump trucks, and skid steer loader <br />together with operators would constitute a value of $8,917 in District <br />e.ce", equipment time and labor costs. The value of the fill material <br />thE! Wau.rWay EaglE! purchased from a gravel provider in the area is estimated at $4,500. <br /> <br /> <br />3. In consideration of the District's participation the District wants the <br />irrigation supply line be piped all the way to the headgate so there is <br />no need for administrative spill into the District's Beswick Drain. It is <br />