My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
July 08 South Platte Minutes
CWCB
>
Basin Roundtables
>
DayForward
>
July 08 South Platte Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/16/2009 4:57:02 PM
Creation date
8/4/2008 8:18:34 PM
Metadata
Fields
Template:
Basin Roundtables
Basin Roundtable
South Platte
Title
South Platte July 08 Meeting Minutes
Date
7/8/2008
Basin Roundtables - Doc Type
Minutes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
assimilative capacity limited in many areas of CO: meeting <br />narrative standards (WET/Ag.) <br />--Role of the Membrane Treatment Work Group: CO Water <br />Quality Control Coimnission (WQCC) Request to CDPHE <br />(determine ho~y to maintain membrane treatment as a viable <br />option in CO; Membrane Treatment Workgroup meeting since <br />Jan 2006; comprised of municipalities and State Dept of Public <br />Health: Report issued in Fa112007: recommended pilot testing of <br />Zero Liquid Discharge technologies: WQCC directed <br />implementation of recommendation <br />--ZLD Pilot Test Scope: Objectives: evaluate multiple <br />technologies on several waters; quantify solids disposal; provide <br />cost basis: gain eiperience iii operation of technologies; <br />performed in multiple basins (Brighton and La Junta); completed <br />by Dec 09; Builds on Results of ECCV Pilot; concurrent energy <br />study (funded separately) <br />--ZLD Pilot Test Management: Overseen by CDPHE: membrane <br />treatment ~~-orkgroup; managed by A~~,~yaRF (American Water <br />Works Research Foundation--CO based non-profit specializing <br />in drinking water research): eiecuted by CDPHE-selected <br />contractor <br />--ZLD Pilot Test Funding: $1.1 million budge + 190K in-kind <br />($100 K WSRA; $0.000 from Metro. AIL approval for $25,000: <br />seeking $25.000 from South Platte Basin; $700 K WSRA <br />(CWCB); $150 IL provided by proponents; $150 IL Aw«aRF <br />(American Water Works Research Foundation) match; planned <br />submission of application for state ~~ ide funds July 18ti' <br />--Project Participants: City of La Junta_ Brighton, East Cheri-~T <br />Creek Valley Water & San District; Metro Wastewater <br />Reclamation District; Denver Water; Aurora Water; Arapahoe <br />County Water & Waste Water Authority; Thornton; South <br />Adams County Water & San; Lochbuie; Northern CO Water <br />Conservancy District; Farmers Reservoir & h-rigation Supply <br />District; WQCD -CDPHE; A~~~yaRF. <br />--$25,000 request in funding from South Platte <br />Questions: <br />Bill Jerke: Hoy is this different from the produced ~yater from oil and <br />gas yells which we inject? <br />Phil Brandhuber: Big difference is ~yhere the ~yater is being produced. <br />Mike Applegate: Moves that this Roundtable approve the $2,000 <br />McVicker: Seconds <br />Motion moves unanimously. <br />2) Shared Vision Planning process at the proposed Halligan Seaman Water <br />Management Project - $25,43_5 from South Platte Basin Account and approval for <br />$76,305 from the Statewide Account <br />Harold Evans presents; introduces guests: Heather Knight with Nature Conservancy; <br />Chandler Peter ~yith Corps of Engineer: Project Manager for Halligan Seaman Project <br />9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.