My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01820 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01820 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2011 8:55:02 AM
Creation date
7/28/2008 3:04:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150189
Contractor Name
Larimer and Weld Irrigation Company, The
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br /> UNIT <br />ITEM DESCRIPTION IOUANTITY UNITS PRICE AMOUNT <br />1. Findley Check <br /> a. Mobilization 1.00 L.S. $ 1,500 $ 1,500 <br /> b. Dewatering 10.00. Days $ 300 $ 3,000 <br /> c. Concrete Repair 20.00 c.Y. $ 650 $ 13,000 <br /> d. Riprap 300.00 TONS $ 22 $ 6,600 <br /> e. Excavation & Backfill 250.00 C.Y. $ 10 $ 2,500 <br /> f. Grout Slab Sub grade 30.00 c.Y. $ 350 $ 10,500 <br /> Subtotal $ 32,600 <br />2 Lake Lee Dam <br /> a. Mobilization 1.00 L.S. $ 1,650 $ 1,650 <br /> b. Dewatering 10.00 Days $ 500 $ 5,000 <br /> c. Concrete Repair 60.00 c.Y. $ 650 $ 39,000 <br /> d. Riprap 500.00 TONS $ 22 $ 11,000 <br /> e. Gate Repair 1.00 L.S. $ 10,000 $ 10,000 <br /> f. Replace Operators 1.00 L.S. $15,000 $ 15,000 <br /> g. Construct Parshall Flume <br /> Concrete 125.00 C.Y. $ 450 $ 56,250 <br /> Dewatering 10.00 Days $ 300 $ 3,000 <br /> Backfill 500.00 c.Y. $ 28 $ 14,000 <br /> Sub grade Stabilization 100.00 c.Y. $ 25 $ 2,500 <br /> Subtotal $ 157,400 <br />3 Big Windsor Inlet & Check <br /> a. Mobilization 1.00 L.S. $ 5,000 $ 5,000 <br /> b. Dewatering 10.00 Days $ 300 $ 3,000 <br /> c. Concrete Repair 75.00 c.Y. $ 650 $ 48,750 <br /> d. Replace Flume Walls <br /> Demolition 1.00 L.S. $ 8,000 $ 8,000 <br /> Concrete Walls 100.00 C.Y. $ 450 $ 45,000 <br /> d. Riprap 300.00 TONS $ 22 $ 6,600 <br /> e. Gate Repair 5.00 Ea $ 4,000 $ 20,000 <br /> f. Replace Check <br /> Concrete 110.00 c.Y.. $ 450 $ 49,500 <br /> Dewatering 10.00 Days $ 300 $ 3,000 <br /> Backfill 500.00 C.Y. $ 28 $ 14,000 <br /> Subgrade Stabilization 100.00 c.Y. $ 25 $ 2,500 <br /> g. Construct Parshall Flume <br /> Concrete 125.00 c.Y. $ 450 $ 56,250 <br /> Dewatering 10.00 Days $ 300 $ 3,000 <br /> Backfill 500.00 c.Y. $ 28 $ 14,000 <br /> Sub grade Stabilization 100.00 c.Y. $ 25 $ 2,500 <br /> Subtotal $ 281,100 <br />TOTAL $ 471,100 <br /> <br />TABLE 2 <br />OPINION OF COST <br />LARIMER & WELD IRRIGATION <br />Alternative No.2 - Repair Structures <br />
The URL can be used to link to this page
Your browser does not support the video tag.