My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJC01820 (2)
CWCB
>
Loan Projects
>
DayForward
>
0001-1000
>
PROJC01820 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2011 8:55:02 AM
Creation date
7/28/2008 3:04:12 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C150189
Contractor Name
Larimer and Weld Irrigation Company, The
Contract Type
Loan
Water District
2
County
Weld
Loan Projects - Doc Type
Feasibility Study
Supplemental fields
Water Division
1
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Alternative #3 <br /> <br />This alternative consist of a total replacement of the existing structures with new concrete <br />structures which incorporates energy management features to control downstream erosion; <br />effective gates for the control of flows; and, measurement capabilities of the flows at Lake Lee <br />Dam and at the Big Windsor Inlet. Obermeyer gates will be used at the Finley Check and at the <br />Big Windsor Inlet check. The gates will not be automated, however, as are those previously <br />installed on the system. The operation of these checks is such that a manual control system is <br />sufficient. Both the Lake Lee Dam and at the Big Windsor Inlet structure gates will be replaced <br />with gates that are also manually controlled. <br /> <br />The Finley Check and Big Windsor Inlet Check will have the same configuration as those <br />previously constructed on the system as shown on Figure B2 in Appendix B of this report. Those <br />checks have a critical-flow throat in a rectangular constricted section, with upstream stilling wells <br />and air-operated Obermeyer gates to control the upstream water surface elevation. Gate operation <br />will be manual with power supplied by an air storage tank: and a portable air compressor. For <br />hydraulic energy management, the downstream sections of the checks have a plunge pool stilling <br />basin, with a solid end sill. Water exits the structures in a trapezoidal cross-section that <br />approximates the downstream ditch cross-section, A downstream riprap apron of approximately <br />40 feet in length provides downstream erosion protection. <br /> <br />The Finley Check will be 25 feet in width based on the maximum flow rate of 1,000 cfs as <br />requested by the Larimer and Weld Irrigation Company. The Big Windsor Inlet Check was also <br />designed for a maximum flow rate of 1,000 cfs and will also be 25 feet in width. <br /> <br />The existing Lake Lee Dam, shown in photographs 3 and in Appendix A, will be completely <br />removed and a new concrete structure which incorporates a Parshall flume to measure flows will <br />be constructed. The new structure is anticipated to be 60 foot in width, 125 feet in length, and <br />approximately 15 feet in depth. The structure will utilize two radial gates to control flows and will <br />have an overflow spillway set at gage height 10 to pass storm flows. A 25 foot wide Parshall <br />flume will be incorporated into the structure and will be capable of measuring flows up to 1200 <br />cfs. A bridge structure will cross over the ditch at this location to allow access to the ditch riders <br />house. The proposed details of the structure are shown on Figure B3 in Appendix B. <br /> <br />The Big Windsor Inlet and Check Structure will also be completely removed and replaced with <br />a new concrete structure. The new structure is anticipated to be 40 foot in width, 220 feet in <br />length, with the depth varying from 15 feet to 35 feet below grade. The new structure will include <br />a check in the main ditch, as described previously, to divert water into the reservoir inlet structure. <br />The inlet structure will consist of an inlet section containing four control gates; a converging <br />section with a Parshall flume; a drop structure to affect the .approximately 35 feet in elevation <br />change from the ditch to the reservoir; and, an outlet to control the energy. The drop structure <br />and outlet will be connected by approximately 115 feet of reinforced concrete pipe. The hydraulic <br />design criteria for this structure is to have a capacity of 800 cfs from the ditch to the reservoir. <br /> <br />Larimer & Weld Feasibility Study <br />Lake Lee & Big Windsor - 03.043 <br /> <br />Page 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.