My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_WatRightScope3_20050111
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_WatRightScope3_20050111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:30:16 AM
Creation date
7/17/2008 10:48:56 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 3 - Relational System Integration and Water Rights Administration Component
Description
The Scope of Work for the Relational System Integration and Water Rights Administration components of the South Platte Decision Support System; Phase 3.
Decision Support - Doc Type
Scope of Work
Date
1/11/2005
DSS Category
Surface Water
DSS
South Platte
Basin
South Platte
Contract/PO #
C153966
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
O C~ <br />Task 157 -Coordination with Consultant Team <br />Objective: <br />Maintain open communication of activities and results with other consultants to benefit <br />SPDSS development efficiency and quality. <br />Approach: <br />157.1 Advisory Meetings. Prepare for and participate in iip to two advisory meetings. <br />157.2 SPDSS Coordination. Schedule up to five meetings (2 in Denver and 3 by <br />phone) to communicate with State and other consultants about data needs, results, issues, <br />progress, etc., during SPDSS development. Also evaluate needs and propose plans for <br />system enhancements based on feedback from State and consultants. <br />Deliverables: <br />157.1 RTi staff will prepare for and participate in advisory meetings, at a level <br />coordinated with the SPDSS consultant and state management team. <br />157.2 Results from coordination meetings will be documented in memoranda, as <br />appropriate. <br />Task 158 -RTi Project Management <br />Objective: <br />To track work accomplished, to maintain budget and schedule, and to regularly report the <br />status of work activities. In addition, promote communications between the Consultant <br />and the State and between the Consultant and other SPDSS Consultants. <br />Approach: <br />158.1 Progress Reports and Invoices. Prepare and present to the State 12 monthly <br />progress reports that include the following three components: <br />A Work Activity Description that describes work accomplished that month and <br />percent complete for each Subtask presented in the; Budget. <br />A Task Summary that describes the Budget, Costs to Date, Percent Spent, <br />Percent Complete, Estimated Cost to Complete, anal Surplus or Shortage. Note <br />this report is expected to identify problem areas whenever the Percent Complete <br />is less than the Percent Spent. Also, the Surplus (~-) or Shortage (-), which is <br />the difference between the Budget and the Estimated Cost to Complete, will <br />quantify the magnitude of potential savings or problems. <br />17 <br />
The URL can be used to link to this page
Your browser does not support the video tag.