My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_MGMTScope3_20041229
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_MGMTScope3_20041229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2010 9:46:26 AM
Creation date
7/17/2008 10:35:51 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 3 - Project Management Assistance & User Involvement Component
Description
Scope of Work for the Project Management Assistance & User Involvement component of the South Platte Decision Support System.
Decision Support - Doc Type
Scope of Work
Date
12/29/2004
DSS
South Platte
Basin
South Platte
Contract/PO #
C153984A
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
f ~ °r <br />159.3 Distribute database and updates of contacts to State ~md other Contractors. <br />Deliverables: <br />159..1 Provide MS-Excel format database of SPDSS contacts ta' State and Contractors <br />Task 160 -Assist the State iri publishing a newsletter and .other communication documents <br />concerning the SPDSS <br />.Approach: <br />160.1 Produce newsletters that provide updates on the status of the project and advertise upcoming <br />meetings. The newsletter will be distributed to the User Group initially by hard copy, but could <br />be distributed in the future by other methods depending on the user's. preference (email, hard <br />copy, webpage, etc). Up 1:0 2 newsletters will be pxoduced based on SPDSS progress and need. <br />Users will be able to a-mail or phone the point of contact at Brown and Caldwell to update <br />personal information. <br />Deliverables: ~ <br />160.1 Establish a time schedule when newsletters will be developed. <br />-160.2 Produce draft newsletters., incoordination with the CWCB Project Manager, in MS-Word for <br />review by the State. Comments will be incorporated into a final newsletter that will be printed <br />and mailed by the State to the members in the user database. <br />Task 163 -Establish technical users groups <br />Approach: <br />163.1 Establish the membership for 2 Technical Peer Review Committees .(Consumptive Use/Water <br />Budget and Groundwater). The main objectives of establishing the Technical. Peer Review <br />Committees are to provide insight into data collection, provide feedback concerning tool and <br />model development, and building consensus. The CWCB Project Manager will chair these <br />committees with assistance from Brown and Caldwell. <br />163.2 Prepare for, and hold, a total of 2 meetings (one meeting for each committee) with the <br />Technical Peer Review Committees for Consumptive Use/Water Budget and <br />Groundwater. <br />163.3 Bring the results of these meetings back to the SPDSS development process. <br />Deliverables: <br />163.1 Establish a schedule for the Technical Peer Review committee meetings. <br />163.2 Draft memoranda of minutes for the 2 meetings and submit to the Contractors and to the State for <br />review within one week after meetings are held. Comments will be incorporated into final <br />meeting minutes and will be distributed, either electronically or in hard copy, to the Contractors, <br />State, and committee members. <br />Task 172 -Assist in developing scopes of work for each contractor for FY2005 <br />Approach: <br />No assistance on this task is required by the State at this time, so no scope or costs are <br />provided. <br />
The URL can be used to link to this page
Your browser does not support the video tag.