My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_MGMTScope3_20041229
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_MGMTScope3_20041229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/26/2010 9:46:26 AM
Creation date
7/17/2008 10:35:51 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 3 - Project Management Assistance & User Involvement Component
Description
Scope of Work for the Project Management Assistance & User Involvement component of the South Platte Decision Support System.
Decision Support - Doc Type
Scope of Work
Date
12/29/2004
DSS
South Platte
Basin
South Platte
Contract/PO #
C153984A
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
,~ -4 <br />a ~~~~ ~~ <br />n ~~Q \ / <br />`~ . <br />Task 173 -Establish SPDSS adviisory committee and core advisory ,group <br />i <br />Approach: <br />173.1. Maintain membership of the Core Advisory Committee, wJhose main objectives are to <br />build consensus and provide general input to the SPDSS',developmentfrnm a <br />managerial perspective. The CWCB Project Manager will chair this committee with <br />assistance from Brown and Caldwell. <br />173.2 Prepare for, and hold, 2 meetings of the Core Advisory Committee. <br />173.3 Bring the results of these meetings back to the SPDSS development process. <br />Deliverables: <br />173.1 Establish a schedule for the Core Advisory Committee meetings. <br />173.2 Draft memoranda of minutes for the 2 meetings and submit to the Contractors and to the State for <br />review within one week after meetings are held. Comments will be incorporated into final <br />meeting minutes and will he distributed, either electronically or in hard copy, to the Contractors, <br />State,' and committee members. <br />Task 174 -Provide technical assistance in the review. of work products submitted by the <br />contractors <br />Approach: <br />174.1 Review, as needed, initial drafts of work products submitted by the Contractors for <br />completeness and qualiity before submission to the State. Provide comments on work <br />products to the Contractors and to the State. Examples of the review include but are not <br />limited to: <br />• Review analysis andl display of all GIS information from the GIS contractor to assure <br />correct datum, consistent attributes, correct correlation to appropriate HydroBase <br />tables, and spatial consistency (no overlaps or gaps in coverages) <br />• Review and analyze irrigated acreage and service areas <br />• Review and analyze the well/water right matching results <br />• Technically review task memoranda <br />• Review progress reports <br />Deliverables: <br />174.1 Develop technical memoranda providing. comments on all reviewed products and submit to the <br />Contractors and the State. <br />
The URL can be used to link to this page
Your browser does not support the video tag.