My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SPDSS_GWScope4_20060915
CWCB
>
Decision Support Systems
>
DayForward
>
SPDSS_GWScope4_20060915
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2011 8:53:06 AM
Creation date
7/17/2008 10:26:55 AM
Metadata
Fields
Template:
Decision Support Systems
Title
SPDSS Phase 4 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
9/15/2006
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
• <br />The dates for submittal and review of the Draft and Draft Final versions maybe subject to change <br />based on discussions with the CWCB project manager. GIS files generated as part of the task <br />also will be transmitted to the CWCB following submittal of the Final Report. <br />Task 49.4 Project Management <br />This task includes progress meetings with the CWCB, will track work accomplished, manage <br />budget and schedule, and report the status of work activities. <br />• The Contractor will hold up to 6 three-hour progress meetings, conducted on an <br />approximately monthly schedule, with the CWCB project manager and experts he deems <br />appropriate. <br />• The Contractor will provide up to 6 monthly progress reports and associated monthly <br />invoices. These will be submitted separately from the progress reports and invoices developed <br />under Task 51. <br />• The progress reports will include a summary description of work accomplished during the <br />previous month and will describe the percent spent by scope and budget, percent complete, <br />and estimated cost to complete. The progress report also will describe any technical, budget <br />and schedule concerns and proposed corrective actions for Task 49. <br />• The invoices will include billing by person with their rate and hours, by task, the other direct <br />costs and a summary of retainage. <br />Task 50: Data Centered Modeling Tool Implementation <br />Objective: <br />The objective of this task is to develop and initiate application of additional software tools needed <br />to advance the data centered modeling concept for the alluvial groundwater modeling. This task <br />builds on the tools developed during Phase 3 and will focus on calibration assistance, pre- and <br />post-processing and utilities for development of Unit Response Functions (URFs). <br />Discussion: <br />Additional tools to facilitate the data centered modeling approach will be developed under this <br />task. These will include tools for integration of calibration assistance and summarization of flows <br />and water levels. Tools and databases for preparing model input files were developed in Phase 3. <br />Development and integration activities in Phase 4 will focus on tools necessary for calibration, <br />SPDSS Phase4_gw_SOW 09-15-06.doc 22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.