SPDSS Phase 4 - Ground Water Component
Description
Scope of Work for the ground water component of the South Platte Decision Support System (SPDSS).
Decision Support - Doc Type
Scope of Work
Date
9/15/2006
DSS Category
Groundwater
DSS
South Platte
Basin
South Platte
Contract/PO #
C153953
Bill Number
SB01-157, HB02-1152, SB03-110, HB04-1221, SB05-084, HB06-1313, SB07-122
Prepared By
CWCB
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
. ~ ~ ~ ~~ ~ <br />Task 49.3 Reporting <br />Stakeholder Meetings <br />• A series of meetings will be conducted with local experts and other appropriate parties as <br />determined by the CWCB project manager. The purpose of these meetings will be to solicit <br />feedback on the site evaluation criteria, to communicate progress on this task, and to obtain <br />addition technical input. <br />It is anticipated that Contractor staff will meet with selected experts and/or groups such as the <br />IBCC Roundtables for up to six half-day meetings. The exact number and duration of <br />meetings will be identified in coordination with the CWCB project manager based on <br />schedule and remaining available budget. Contractor will prepare presentation materials for <br />the meetings, if needed, and will prepare summary meeting minutes that identify key <br />suggestions and concerns raised by the local experts. <br />Deliverable: <br />Project Report <br />• A report, anticipated to be up to 20 pages in length, not including f gures, tables and <br />appendices, will be prepared regarding the work performed in Tasks 49.1 and 49.2. This <br />report will be written for anon-technical audience and will be supplemented by appendices <br />that contain data and technical analyses that are summarized in the report. <br />• The Draft version of the report will be submitted in electronic (MS Word) format to the <br />CWCB project manager for review, with atwo-week turnaround anticipated. The Contractor <br />will address comments within atwo-week period and will submit a Draft Final version of the <br />report in electronic format for review by the CWCB, CGS and other parties, as determined by <br />the CWCB project manager. A two-week review period is anticipated on the Draft Final. The <br />Contractor will address comments within atwo-week period, in consultation with the CWCB <br />project manager, and will submit the Final Report in electronic (MS Word and pdf) and hard- <br />copy formats. It is anticipated that up to twenty-five paper copies of the Final Report will be <br />bound and submitted to the CWCB. <br />• The Report Schedule is anticipated to include the following: <br />o submittal of the Dra$ version by January 5, 2007 <br />o receipt of comments on the Draft by January 19 <br />o submittal of the Draft Final version by February 2 <br />o receipt of comments on the Draft Final by February 16 <br />o submittal of the Final Report by March 1, 2007 <br />SPDSS Phase4_gvv_SOW_09-IS-06.doc 21 <br />
The URL can be used to link to this page
Your browser does not support the video tag.